Browse Federal regulations
Read the original sections, or search by topic.
- 40 CFR 60.1625 · How do I comply with the increment of progress for completing onsite construction?
- 40 CFR 60.1630 · How do I comply with the increment of progress for achieving final compliance?
- 40 CFR 60.1635 · What must I do if I close my municipal waste combustion unit and then restart my municipal waste combustion unit?
- 40 CFR 60.1640 · What must I do if I plan to permanently close my municipal waste combustion unit and not restart it?
- 40 CFR 60.1645 · What types of training must I do?
- 40 CFR 60.1650 · Who must complete the operator training course? By when?
- 40 CFR 60.1655 · Who must complete the plant-specific training course?
- 40 CFR 60.1660 · What plant-specific training must I provide?
- 40 CFR 60.1665 · What information must I include in the plant-specific operating manual?
- 40 CFR 60.1670 · Where must I keep the plant-specific operating manual?
- 40 CFR 60.1675 · What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it?
- 40 CFR 60.1680 · After the required date for operator certification, who may operate the municipal waste combustion unit?
- 40 CFR 60.1685 · What if all the certified operators must be temporarily offsite?
- 40 CFR 60.1690 · What are the operating practice requirements for my municipal waste combustion unit?
- 40 CFR 60.1695 · What happens to the operating requirements during periods of startup, shutdown, and malfunction?
- 40 CFR 60.1700 · What pollutants are regulated by this subpart?
- 40 CFR 60.1705 · What emission limits must I meet? By when?
- 40 CFR 60.1710 · What happens to the emission limits during periods of startup, shutdown, and malfunction?
- 40 CFR 60.1715 · What types of continuous emission monitoring must I perform?
- 40 CFR 60.1720 · What continuous emission monitoring systems must I install for gaseous pollutants?
- 40 CFR 60.1725 · How are the data from the continuous emission monitoring systems used?
- 40 CFR 60.1730 · How do I make sure my continuous emission monitoring systems are operating correctly?
- 40 CFR 60.1735 · Am I exempt from any appendix B or appendix F requirements to evaluate continuous emission monitoring systems?
- 40 CFR 60.1740 · What is my schedule for evaluating continuous emission monitoring systems?
- 40 CFR 60.1745 · What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas?
- 40 CFR 60.1750 · What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems and is the data collection requirement enforceable?
- 40 CFR 60.1755 · How do I convert my 1-hour arithmetic averages into appropriate averaging times and units?
- 40 CFR 60.1760 · What is required for my continuous opacity monitoring system and how are the data used?
- 40 CFR 60.1765 · What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system?
- 40 CFR 60.1770 · What must I do if any of my continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements?
- 40 CFR 60.1775 · What types of stack tests must I conduct?
- 40 CFR 60.1780 · How are the stack test data used?
- 40 CFR 60.1785 · What schedule must I follow for the stack testing?
- 40 CFR 60.1790 · What test methods must I use to stack test?
- 40 CFR 60.1795 · May I conduct stack testing less often?
- 40 CFR 60.1800 · May I deviate from the 13-month testing schedule if unforeseen circumstances arise?
- 40 CFR 60.1805 · Must I meet other requirements for continuous monitoring?
- 40 CFR 60.1810 · How do I monitor the load of my municipal waste combustion unit?
- 40 CFR 60.1815 · How do I monitor the temperature of flue gases at the inlet of my particulate matter control device?
- 40 CFR 60.1820 · How do I monitor the injection rate of activated carbon?
- 40 CFR 60.1825 · What is the minimum amount of monitoring data I must collect with my continuous parameter monitoring systems and is the data collection requirement enforceable?
- 40 CFR 60.1830 · What records must I keep?
- 40 CFR 60.1835 · Where must I keep my records and for how long?
- 40 CFR 60.1840 · What records must I keep for operator training and certification?
- 40 CFR 60.1845 · What records must I keep for stack tests?
- 40 CFR 60.1850 · What records must I keep for continuously monitored pollutants or parameters?
- 40 CFR 60.1855 · What records must I keep for municipal waste combustion units that use activated carbon?
- 40 CFR 60.1860 · What reports must I submit and in what form?
- 40 CFR 60.1865 · What are the appropriate units of measurement for reporting my data?
- 40 CFR 60.1870 · When must I submit the initial report?
- 40 CFR 60.1875 · What must I include in my initial report?
- 40 CFR 60.1880 · When must I submit the annual report?
- 40 CFR 60.1885 · What must I include in my annual report?
- 40 CFR 60.1890 · What must I do if I am out of compliance with the requirements of this subpart?
- 40 CFR 60.1895 · If a semiannual report is required, when must I submit it?
- 40 CFR 60.1900 · What must I include in the semiannual out-of-compliance reports?
- 40 CFR 60.1905 · Can reporting dates be changed?
- 40 CFR 60.1910 · What is an air curtain incinerator?
- 40 CFR 60.1915 · What is yard waste?
- 40 CFR 60.1920 · What are the emission limits for air curtain incinerators that burn 100 percent yard waste?
- 40 CFR 60.1925 · How must I monitor opacity for air curtain incinerators that burn 100 percent yard waste?
- 40 CFR 60.1930 · What are the recordkeeping and reporting requirements for air curtain incinerators that burn 100 percent yard waste?
- 40 CFR 60.1935 · What equations must I use?
- 40 CFR 60.1940 · What definitions must I know?
- 40 CFR Table 1 to Subpart BBBB of Part 60 · Table 1 to Subpart BBBB of Part 60—Model Rule—Compliance Schedules and Increments of Progress
- 40 CFR Table 2 to Subpart BBBB of Part 60 · Table 2 to Subpart BBBB of Part 60—Model Rule—Class I Emission Limits for Existing Small Municipal Waste Combustion Units a
- 40 CFR Table 3 to Subpart BBBB of Part 60 · Table 3 to Subpart BBBB of Part 60—Model Rule—Class I Nitrogen Oxides Emission Limits for Existing Small Municipal Waste Combustion Units a b c
- 40 CFR Table 4 to Subpart BBBB of Part 60 · Table 4 to Subpart BBBB of Part 60—Model Rule—Class II Emission Limits for Existing Small Municipal Waste Combustion Unit a
- 40 CFR Table 5 to Subpart BBBB of Part 60 · Table 5 to Subpart BBBB of Part 60—Model Rule—Carbon Monoxide Emission Limits for Existing Small Municipal Waste Combustion Units
- 40 CFR Table 6 to Subpart BBBB of Part 60 · Table 6 to Subpart BBBB of Part 60—Model Rule—Requirements for Validating Continuous Emission Monitoring Systems (CEMS)
- 40 CFR Table 7 to Subpart BBBB of Part 60 · Table 7 to Subpart BBBB of Part 60—Model Rule—Requirements for Continuous Emission Monitoring Systems (CEMS)
- 40 CFR Table 8 to Subpart BBBB of Part 60 · Table 8 to Subpart BBBB of Part 60—Model Rule—Requirements for Stack Tests
- 40 CFR 60.2000 · What does this subpart do?
- 40 CFR 60.2005 · When did this subpart become effective?
- 40 CFR 60.2010 · Does this subpart apply to my incineration unit?
- 40 CFR 60.2015 · What is a new incineration unit?
- 40 CFR 60.2020 · What combustion units are exempt from this subpart?
- 40 CFR 60.2030 · Who implements and enforces this subpart?
- 40 CFR 60.2035 · How are these new source performance standards structured?
- 40 CFR 60.2040 · Do all eleven components of these new source performance standards apply at the same time?
- 40 CFR 60.2041 · [Reserved]
- 40 CFR 60.2045 · Who must prepare a siting analysis?
- 40 CFR 60.2050 · What is a siting analysis?
- 40 CFR 60.2055 · What is a waste management plan?
- 40 CFR 60.2060 · When must I submit my waste management plan?
- 40 CFR 60.2065 · What should I include in my waste management plan?
- 40 CFR 60.2070 · What are the operator training and qualification requirements?
- 40 CFR 60.2075 · When must the operator training course be completed?
- 40 CFR 60.2080 · How do I obtain my operator qualification?
- 40 CFR 60.2085 · How do I maintain my operator qualification?
- 40 CFR 60.2090 · How do I renew my lapsed operator qualification?
- 40 CFR 60.2095 · What site-specific documentation is required?
- 40 CFR 60.2100 · What if all the qualified operators are temporarily not accessible?
- 40 CFR 60.2105 · What emission limitations must I meet and by when?
- 40 CFR 60.2110 · What operating limits must I meet and by when?
- 40 CFR 60.2115 · What if I do not use a wet scrubber, fabric filter, activated carbon injection, selective noncatalytic reduction, an electrostatic precipitator, or a dry scrubber to comply with the emission limitations?
- 40 CFR 60.2125 · How do I conduct the initial and annual performance test?
- 40 CFR 60.2130 · How are the performance test data used?
- 40 CFR 60.2135 · How do I demonstrate initial compliance with the emission limitations and establish the operating limits?
- 40 CFR 60.2140 · By what date must I conduct the initial performance test?