Browse Federal regulations
Read the original sections, or search by topic.
- 40 CFR 60.6610 · What are the appropriate units of measurement for reporting my data?
- 40 CFR 60.6615 · When must I submit the initial performance test report?
- 40 CFR 60.6620 · What must I include in my initial performance test report?
- 40 CFR 60.6625 · When must I submit the annual report?
- 40 CFR 60.6630 · What must I include in my annual report?
- 40 CFR 60.6635 · What must I do if I am out of compliance with the requirements of this subpart?
- 40 CFR 60.6640 · If a semiannual report is required, when must I submit it?
- 40 CFR 60.6645 · What must I include in the semiannual out-of-compliance reports?
- 40 CFR 60.6650 · Can reporting dates be changed?
- 40 CFR 60.6655 · What is an air curtain incinerator?
- 40 CFR 60.6660 · What is yard waste?
- 40 CFR 60.6665 · What are the emission limits for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
- 40 CFR 60.6670 · How must I monitor opacity for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
- 40 CFR 60.6675 · What are the recordkeeping and reporting requirements for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
- 40 CFR 60.6680 · What equations must I use?
- 40 CFR 60.6685 · What definitions apply to this subpart?
- 40 CFR Table 1 to Subpart WWWW of Part 60 · Table 1 to Subpart WWWW of Part 60—Model Rule—Compliance Schedules and Increments of Progress
- 40 CFR Table 2 to Subpart WWWW · Table 2 to Subpart WWWW—Municipal Waste Combustor Carbon Monoxide Guidelines
- 40 CFR Table 3 to Subpart WWWW of Part 60 · Table 3 to Subpart WWWW of Part 60—Model Rule—Emission Limits for Existing Large Municipal Waste Combustors
- 40 CFR Table 4 to Subpart WWWW of Part 60 · Table 4 to Subpart WWWW of Part 60—Requirements for Continuous Emission Monitoring Systems (CEMS)
- 40 CFR Table 5 to Subpart WWWW · Table 5 to Subpart WWWW—Performance Test Requirements for Compliance With Emissions Limits Under § 60.6450
- 40 CFR Appendix A-1 to Part 60 · Appendix A-1 to Part 60—Test Methods 1 through 2F
- 40 CFR Appendix A-2 to Part 60 · Appendix A-2 to Part 60—Test Methods 2G through 3C
- 40 CFR Appendix A-3 to Part 60 · Appendix A-3 to Part 60—Test Methods 4 through 5I
- 40 CFR Appendix A-4 to Part 60 · Appendix A-4 to Part 60—Test Methods 6 through 10B
- 40 CFR Appendix A-5 to Part 60 · Appendix A-5 to Part 60—Test Methods 11 through 15A
- 40 CFR Appendix A-6 to Part 60 · Appendix A-6 to Part 60—Test Methods 16 through 18
- 40 CFR Appendix A-7 to Part 60 · Appendix A-7 to Part 60—Test Methods 19 through 25E
- 40 CFR Appendix A-8 to Part 60 · Appendix A-8 to Part 60—Test Methods 26 through 30B
- 40 CFR Appendix B to Part 60 · Appendix B to Part 60—Performance Specifications
- 40 CFR Appendix C to Part 60 · Appendix C to Part 60—Determination of Emission Rate Change
- 40 CFR Appendix D to Part 60 · Appendix D to Part 60—Required Emission Inventory Information
- 40 CFR Appendix E to Part 60 · Appendix E to Part 60 [Reserved]
- 40 CFR Appendix F to Part 60 · Appendix F to Part 60—Quality Assurance Procedures
- 40 CFR Appendix G to Part 60 · Appendix G to Part 60—Provisions for an Alternative Method of Demonstrating Compliance With 40 CFR 60.43 for the Newton Power Station of Central Illinois Public Service Company
- 40 CFR Appendix H to Part 60 · Appendix H to Part 60 [Reserved]
- 40 CFR Appendix I to Part 60 · Appendix I to Part 60—Owner's Manuals and Temporary Labels for Wood Heaters Subject to Subparts AAA and QQQQ of Part 60
- 40 CFR Appendix J to Part 60 · Appendix J to Part 60 [Reserved]
- 40 CFR Appendix K to Part 60 · Appendix K to Part 60—Determination of Volatile Organic Compound and Greenhouse Gas Leaks Using Optical Gas Imaging
- 40 CFR 61.01 · Lists of pollutants and applicability of part 61.
- 40 CFR 61.02 · Definitions.
- 40 CFR 61.03 · Units and abbreviations.
- 40 CFR 61.04 · Address.
- 40 CFR 61.05 · Prohibited activities.
- 40 CFR 61.06 · Determination of construction or modification.
- 40 CFR 61.07 · Application for approval of construction or modification.
- 40 CFR 61.08 · Approval of construction or modification.
- 40 CFR 61.09 · Notification of startup.
- 40 CFR 61.10 · Source reporting and waiver request.
- 40 CFR 61.11 · Waiver of compliance.
- 40 CFR 61.12 · Compliance with standards and maintenance requirements.
- 40 CFR 61.13 · Emission tests and waiver of emission tests.
- 40 CFR 61.14 · Monitoring requirements.
- 40 CFR 61.15 · Modification.
- 40 CFR 61.16 · Availability of information.
- 40 CFR 61.17 · State authority.
- 40 CFR 61.18 · Incorporations by reference.
- 40 CFR 61.19 · Circumvention.
- 40 CFR 61.20 · Designation of facilities.
- 40 CFR 61.21 · Definitions.
- 40 CFR 61.22 · Standard.
- 40 CFR 61.23 · Determining compliance.
- 40 CFR 61.24 · Annual reporting requirements.
- 40 CFR 61.25 · Recordkeeping requirements.
- 40 CFR 61.26 · Exemption from the reporting and testing requirements of 40 CFR 61.10.
- 40 CFR 61.30 · Applicability.
- 40 CFR 61.31 · Definitions.
- 40 CFR 61.32 · Emission standard.
- 40 CFR 61.33 · Stack sampling.
- 40 CFR 61.34 · Air sampling.
- 40 CFR 61.40 · Applicability.
- 40 CFR 61.41 · Definitions.
- 40 CFR 61.42 · Emission standard.
- 40 CFR 61.43 · Emission testing—rocket firing or propellant disposal.
- 40 CFR 61.44 · Stack sampling.
- 40 CFR 61.50 · Applicability.
- 40 CFR 61.51 · Definitions.
- 40 CFR 61.52 · Emission standard.
- 40 CFR 61.53 · Stack sampling.
- 40 CFR 61.54 · Sludge sampling.
- 40 CFR 61.55 · Monitoring of emissions and operations.
- 40 CFR 61.56 · Delegation of authority.
- 40 CFR 61.60 · Applicability.
- 40 CFR 61.61 · Definitions.
- 40 CFR 61.62 · Emission standard for ethylene dichloride plants.
- 40 CFR 61.63 · Emission standard for vinyl chloride plants.
- 40 CFR 61.64 · Emission standard for polyvinyl chloride plants.
- 40 CFR 61.65 · Emission standard for ethylene dichloride, vinyl chloride and polyvinyl chloride plants.
- 40 CFR 61.66 · Equivalent equipment and procedures.
- 40 CFR 61.67 · Emission tests.
- 40 CFR 61.68 · Emission monitoring.
- 40 CFR 61.69 · Initial report.
- 40 CFR 61.70 · Reporting.
- 40 CFR 61.71 · Recordkeeping.
- 40 CFR 61.90 · Designation of facilities.
- 40 CFR 61.91 · Definitions.
- 40 CFR 61.92 · Standard.
- 40 CFR 61.93 · Emission monitoring and test procedures.
- 40 CFR 61.94 · Compliance and reporting.
- 40 CFR 61.95 · Recordkeeping requirements.