Browse Federal regulations
Read the original sections, or search by topic.
- 40 CFR 62.15110 · Who must complete the plant-specific training course?
- 40 CFR 62.15115 · What plant-specific training must I provide?
- 40 CFR 62.15120 · What information must I include in the plant-specific operating manual?
- 40 CFR 62.15125 · Where must I keep the plant-specific operating manual?
- 40 CFR 62.15130 · What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it?
- 40 CFR 62.15135 · After the required date for operator certification, who may operate the municipal waste combustion unit?
- 40 CFR 62.15140 · What if all the certified operators must be temporarily offsite?
- 40 CFR 62.15145 · What are the operating practice requirements for my municipal waste combustion unit?
- 40 CFR 62.15150 · What happens to the operating requirements during periods of startup, shutdown, and malfunction?
- 40 CFR 62.15155 · What pollutants are regulated by this subpart?
- 40 CFR 62.15160 · What emission limits must I meet?
- 40 CFR 62.15165 · What happens to the emission limits during periods of startup, shutdown, and malfunction?
- 40 CFR 62.15170 · What types of continuous emission monitoring must I perform?
- 40 CFR 62.15175 · What continuous emission monitoring systems must I install for gaseous pollutants?
- 40 CFR 62.15180 · How are the data from the continuous emission monitoring systems used?
- 40 CFR 62.15185 · How do I make sure my continuous emission monitoring systems are operating correctly?
- 40 CFR 62.15190 · Am I exempt from any 40 CFR part 60 appendix B or appendix F requirements to evaluate continuous emission monitoring systems?
- 40 CFR 62.15195 · What is my schedule for evaluating continuous emission monitoring systems?
- 40 CFR 62.15200 · What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas?
- 40 CFR 62.15205 · What minimum amount of monitoring data must I collect with my continuous emission monitoring systems and is this requirement enforceable?
- 40 CFR 62.15210 · How do I convert my 1-hour arithmetic averages into appropriate averaging times and units?
- 40 CFR 62.15215 · What is required for my continuous opacity monitoring system and how are the data used?
- 40 CFR 62.15220 · What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system?
- 40 CFR 62.15225 · What must I do if my continuous emission monitoring system is temporarily unavailable to meet the data collection requirements?
- 40 CFR 62.15230 · What types of stack tests must I conduct?
- 40 CFR 62.15235 · How are the stack test data used?
- 40 CFR 62.15240 · What schedule must I follow for the stack testing?
- 40 CFR 62.15245 · What test methods must I use to stack test?
- 40 CFR 62.15250 · May I conduct stack testing less often?
- 40 CFR 62.15255 · May I deviate from the 13-month testing schedule if unforeseen circumstances arise?
- 40 CFR 62.15260 · What other requirements must I meet for continuous monitoring?
- 40 CFR 62.15265 · How do I monitor the load of my municipal waste combustion unit?
- 40 CFR 62.15270 · How do I monitor the temperature of flue gases at the inlet of my particulate matter control device?
- 40 CFR 62.15275 · How do I monitor the injection rate of activated carbon?
- 40 CFR 62.15280 · What minimum amount of monitoring data must I collect with my continuous parameter monitoring systems and is this requirement enforceable?
- 40 CFR 62.15285 · What records must I keep?
- 40 CFR 62.15290 · Where must I keep my records and for how long?
- 40 CFR 62.15295 · What records must I keep for operator training and certification?
- 40 CFR 62.15300 · What records must I keep for stack tests?
- 40 CFR 62.15305 · What records must I keep for continuously monitored pollutants or parameters?
- 40 CFR 62.15310 · What records must I keep for municipal waste combustion units that use activated carbon?
- 40 CFR 62.15315 · What reports must I submit and in what form?
- 40 CFR 62.15320 · What are the appropriate units of measurement for reporting my data?
- 40 CFR 62.15325 · When must I submit the initial report?
- 40 CFR 62.15330 · What must I include in the initial report?
- 40 CFR 62.15335 · When must I submit the annual report?
- 40 CFR 62.15340 · What must I include in the annual report?
- 40 CFR 62.15345 · What must I do if I am out of compliance with these standards?
- 40 CFR 62.15350 · If a semiannual report is required, when must I submit it?
- 40 CFR 62.15355 · What must I include in the semiannual out-of-compliance reports?
- 40 CFR 62.15360 · Can reporting dates be changed?
- 40 CFR 62.15365 · What is an air curtain incinerator?
- 40 CFR 62.15370 · What is yard waste?
- 40 CFR 62.15375 · What are the emission limits for air curtain incinerators that burn 100 percent yard waste?
- 40 CFR 62.15380 · How must I monitor opacity for air curtain incinerators that burn 100 percent yard waste?
- 40 CFR 62.15385 · What are the recordkeeping and reporting requirements for air curtain incinerators that burn 100 percent yard waste?
- 40 CFR 62.15390 · What equations must I use?
- 40 CFR 62.15395 · Does this subpart require me to obtain an operating permit under title V of the Clean Air Act?
- 40 CFR 62.15400 · When must I submit a title V permit application for my existing small municipal waste combustion unit?
- 40 CFR 62.15405 · What authorities are retained by the Administrator?
- 40 CFR 62.15410 · What definitions must I know?
- 40 CFR Table 1 to Subpart JJJ of Part 62 · Table 1 to Subpart JJJ of Part 62—Generic Compliance Schedules and Increments of Progress
- 40 CFR Table 2 to Subpart JJJ of Part 62 · Table 2 to Subpart JJJ of Part 62—Class I Emission Limits for Existing Small Municipal Waste Combustion Limits
- 40 CFR Table 3 to Subpart JJJ of Part 62 · Table 3 to Subpart JJJ of Part 62—Class I Nitrogen Oxides Emission Limits for Existing Small Municipal Waste Combustion Units a b c
- 40 CFR Table 4 to Subpart JJJ of Part 62 · Table 4 to Subpart JJJ of Part 62—Class II Emission Limits for Existing Small Municipal Waste Combustion Units a
- 40 CFR Table 5 to Subpart JJJ of Part 62 · Table 5 to Subpart JJJ of Part 62—Carbon Monoxide Emission Limits for Existing Small Municipal Waste Combustion Units
- 40 CFR Table 6 to Subpart JJJ of Part 62 · Table 6 to Subpart JJJ of Part 62—Requirements for Validating Continuous Emission Monitoring Systems (CEMS)
- 40 CFR Table 7 to Subpart JJJ of Part 62 · Table 7 to Subpart JJJ of Part 62—Requirements for Continuous Emission Monitoring Systems (CEMS) a
- 40 CFR Table 8 to Subpart JJJ of Part 62 · Table 8 to Subpart JJJ of Part 62—Requirements for Stack Tests
- 40 CFR Table 9 to Subpart JJJ of Part 62 · Table 9 to Subpart JJJ of Part 62—Site-specific Compliance Schedules and Increments of Progress
- 40 CFR 62.15855 · Am I subject to this subpart?
- 40 CFR 62.15860 · What SSI units are exempt from the federal plan?
- 40 CFR 62.15865 · How do I determine if my SSI unit is covered by an approved and effective state or tribal plan?
- 40 CFR 62.15870 · If my SSI unit is not listed on the federal plan inventory, am I exempt from this subpart?
- 40 CFR 62.15875 · What is my final compliance date?
- 40 CFR 62.15880 · [Reserved]
- 40 CFR 62.15885 · What must I include in the notifications of achievement of compliance?
- 40 CFR 62.15890 · When must I submit the notifications of achievement of compliance?
- 40 CFR 62.15895 · What if I do not meet the compliance date?
- 40 CFR 62.15900 · How do I comply with the requirement for submittal of a control plan?
- 40 CFR 62.15905 · How do I achieve final compliance?
- 40 CFR 62.15910 · What must I do if I close my SSI unit and then restart it?
- 40 CFR 62.15915 · What must I do if I plan to permanently close my SSI unit and not restart it?
- 40 CFR 62.15920 · What are the operator training and qualification requirements?
- 40 CFR 62.15925 · When must the operator training course be completed?
- 40 CFR 62.15930 · How do I obtain my operator qualification?
- 40 CFR 62.15935 · How do I maintain my operator qualification?
- 40 CFR 62.15940 · How do I renew my lapsed operator qualification?
- 40 CFR 62.15945 · What if all the qualified operators are temporarily not accessible?
- 40 CFR 62.15950 · What site-specific documentation is required and how often must it be reviewed by qualified operators and plant personnel?
- 40 CFR 62.15955 · What emission limits and standards must I meet and by when?
- 40 CFR 62.15960 · What operating limits and requirements must I meet and by when?
- 40 CFR 62.15965 · How do I establish operating limits if I do not use a wet scrubber, fabric filter, electrostatic precipitator, activated carbon injection, or afterburner, or if I limit emissions in some other manner, to comply with the emission limits?
- 40 CFR 62.15970 · Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction?
- 40 CFR 62.15975 · [Reserved]
- 40 CFR 62.15980 · How and when do I demonstrate initial compliance with the emission limits and standards?
- 40 CFR 62.15985 · How do I establish my operating limits?
- 40 CFR 62.15990 · By what date must I conduct the initial air pollution control device inspection and make any necessary repairs?
- 40 CFR 62.15995 · How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation?
- 40 CFR 62.16000 · How and when do I demonstrate continuous compliance with the emission limits and standards?