Browse Federal regulations
Read the original sections, or search by topic.
- 40 CFR 73.26 · Conservation and renewable energy reserve.
- 40 CFR 73.27 · Special allowance reserve.
- 40 CFR 73.30 · Allowance tracking system accounts.
- 40 CFR 73.31 · Establishment of accounts.
- 40 CFR 73.32 · [Reserved]
- 40 CFR 73.33 · Authorized account representative.
- 40 CFR 73.34 · Recordation in accounts.
- 40 CFR 73.35 · Compliance.
- 40 CFR 73.36 · Banking.
- 40 CFR 73.37 · Account error.
- 40 CFR 73.38 · Closing of accounts.
- 40 CFR 73.50 · Scope and submission of transfers.
- 40 CFR 73.51 · [Reserved]
- 40 CFR 73.52 · EPA recordation.
- 40 CFR 73.53 · Notification.
- 40 CFR 73.70 · Auctions.
- 40 CFR 73.71 · Bidding.
- 40 CFR 73.72 · Direct sales.
- 40 CFR 73.73 · Delegation of auctions and sales and termination of auctions and sales.
- 40 CFR 73.80 · Operation of allowance reserve program for conservation and renewable energy.
- 40 CFR 73.81 · Qualified conservation measures and renewable energy generation.
- 40 CFR 73.82 · Application for allowances from reserve program.
- 40 CFR 73.83 · Secretary of Energy's action on net income neutrality applications.
- 40 CFR 73.84 · Administrator's action on applications.
- 40 CFR 73.85 · Administrator review of the reserve program.
- 40 CFR 73.86 · State regulatory autonomy.
- 40 CFR Appendix A to Subpart F of Part 73 · Appendix A to Subpart F of Part 73—List of Qualified Energy Conservation Measures, Qualified Renewable Generation, and Measures Applicable for Reduced Utilization
- 40 CFR 73.90 · Allowance allocations for small diesel refineries.
- 40 CFR 74.1 · Purpose and scope.
- 40 CFR 74.2 · Applicability.
- 40 CFR 74.3 · Relationship to the Acid Rain program requirements.
- 40 CFR 74.4 · Designated representative.
- 40 CFR 74.10 · Roles—EPA and permitting authority.
- 40 CFR 74.12 · Opt-in permit contents.
- 40 CFR 74.14 · Opt-in permit process.
- 40 CFR 74.16 · Application requirements for combustion sources.
- 40 CFR 74.17 · Application requirements for process sources. [Reserved]
- 40 CFR 74.18 · Withdrawal.
- 40 CFR 74.19 · Revision and renewal of opt-in permit.
- 40 CFR 74.20 · Data for baseline and alternative baseline.
- 40 CFR 74.22 · Actual SO2 emissions rate.
- 40 CFR 74.23 · 1985 Allowable SO2 emissions rate.
- 40 CFR 74.24 · Current allowable SO2 emissions rate.
- 40 CFR 74.25 · Current promulgated SO2 emissions limit.
- 40 CFR 74.26 · Allocation formula.
- 40 CFR 74.28 · Allowance allocation for combustion sources becoming opt-in sources on a date other than January 1.
- 40 CFR 74.40 · Establishment of opt-in source allowance accounts.
- 40 CFR 74.41 · Identifying allowances.
- 40 CFR 74.42 · Limitation on transfers.
- 40 CFR 74.43 · Annual compliance certification report.
- 40 CFR 74.44 · Reduced utilization for combustion sources.
- 40 CFR 74.45 · Reduced utilization for process sources. [Reserved]
- 40 CFR 74.46 · Opt-in source permanent shutdown, reconstruction, or change in affected status.
- 40 CFR 74.47 · Transfer of allowances from the replacement of thermal energy—combustion sources.
- 40 CFR 74.48 · Transfer of allowances from the replacement of thermal energy—process sources. [Reserved]
- 40 CFR 74.49 · Calculation for deducting allowances.
- 40 CFR 74.50 · Deducting opt-in source allowances from ATS accounts.
- 40 CFR 74.60 · Monitoring requirements.
- 40 CFR 74.61 · Monitoring plan.
- 40 CFR 75.1 · Purpose and scope.
- 40 CFR 75.2 · Applicability.
- 40 CFR 75.3 · General Acid Rain Program provisions.
- 40 CFR 75.4 · Compliance dates.
- 40 CFR 75.5 · Prohibitions.
- 40 CFR 75.6 · Incorporation by reference.
- 40 CFR 75.7-75.8 · §§ 75.7-75.8 [Reserved]
- 40 CFR 75.10 · General operating requirements.
- 40 CFR 75.11 · Specific provisions for monitoring SO2 emissions.
- 40 CFR 75.12 · Specific provisions for monitoring NOX emission rate.
- 40 CFR 75.13 · Specific provisions for monitoring CO2 emissions.
- 40 CFR 75.14 · Specific provisions for monitoring opacity.
- 40 CFR 75.15 · [Reserved]
- 40 CFR 75.16 · Special provisions for monitoring emissions from common, bypass, and multiple stacks for SO2 emissions and heat input determinations.
- 40 CFR 75.17 · Specific provisions for monitoring emissions from common, bypass, and multiple stacks for NO X emission rate.
- 40 CFR 75.18 · Specific provisions for monitoring emissions from common and by-pass stacks for opacity.
- 40 CFR 75.19 · Optional SO2, NOX, and CO2 emissions calculation for low mass emissions (LME) units.
- 40 CFR 75.20 · Initial certification and recertification procedures.
- 40 CFR 75.21 · Quality assurance and quality control requirements.
- 40 CFR 75.22 · Reference test methods.
- 40 CFR 75.23 · Alternatives to standards incorporated by reference.
- 40 CFR 75.24 · Out-of-control periods and adjustment for system bias.
- 40 CFR 75.30 · General provisions.
- 40 CFR 75.31 · Initial missing data procedures.
- 40 CFR 75.32 · Determination of monitor data availability for standard missing data procedures.
- 40 CFR 75.33 · Standard missing data procedures for SO2, NOX, and flow rate.
- 40 CFR 75.34 · Units with add-on emission controls.
- 40 CFR 75.35 · Missing data procedures for CO2..
- 40 CFR 75.36 · Missing data procedures for heat input rate determinations.
- 40 CFR 75.37 · Missing data procedures for moisture.
- 40 CFR 75.38-75.39 · §§ 75.38-75.39 [Reserved]
- 40 CFR 75.40 · General demonstration requirements.
- 40 CFR 75.41 · Precision criteria.
- 40 CFR 75.42 · Reliability criteria.
- 40 CFR 75.43 · Accessibility criteria.
- 40 CFR 75.44 · Timeliness criteria.
- 40 CFR 75.45 · Daily quality assurance criteria.
- 40 CFR 75.46 · Missing data substitution criteria.
- 40 CFR 75.47 · Criteria for a class of affected units.
- 40 CFR 75.48 · Petition for an alternative monitoring system.
- 40 CFR 75.50-75.52 · §§ 75.50-75.52 [Reserved]