Browse Federal regulations
Read the original sections, or search by topic.
- 40 CFR 144.32 · Signatories to permit applications and reports.
- 40 CFR 144.33 · Area permits.
- 40 CFR 144.34 · Emergency permits.
- 40 CFR 144.35 · Effect of a permit.
- 40 CFR 144.36 · Duration of permits.
- 40 CFR 144.37 · Continuation of expiring permits.
- 40 CFR 144.38 · Transfer of permits.
- 40 CFR 144.39 · Modification or revocation and reissuance of permits.
- 40 CFR 144.40 · Termination of permits.
- 40 CFR 144.41 · Minor modifications of permits.
- 40 CFR 144.51 · Conditions applicable to all permits.
- 40 CFR 144.52 · Establishing permit conditions.
- 40 CFR 144.53 · Schedule of compliance.
- 40 CFR 144.54 · Requirements for recording and reporting of monitoring results.
- 40 CFR 144.55 · Corrective action.
- 40 CFR 144.60 · Applicability.
- 40 CFR 144.61 · Definitions of terms as used in this subpart.
- 40 CFR 144.62 · Cost estimate for plugging and abandonment.
- 40 CFR 144.63 · Financial assurance for plugging and abandonment.
- 40 CFR 144.64 · Incapacity of owners or operators, guarantors, or financial institutions.
- 40 CFR 144.65 · Use of State-required mechanisms.
- 40 CFR 144.66 · State assumption of responsibility.
- 40 CFR 144.70 · Wording of the instruments.
- 40 CFR 144.79 · General.
- 40 CFR 144.80 · What is a Class V injection well?
- 40 CFR 144.81 · Does this subpart apply to me?
- 40 CFR 144.82 · What must I do to protect underground sources of drinking water?
- 40 CFR 144.83 · Do I need to notify anyone about my Class V injection well?
- 40 CFR 144.84 · Do I need to get a permit?
- 40 CFR 144.85 · Do these additional requirements apply to me?
- 40 CFR 144.86 · What are the definitions I need to know?
- 40 CFR 144.87 · How does the identification of ground water protection areas and other sensitive ground water areas affect me?
- 40 CFR 144.88 · What are the additional requirements?
- 40 CFR 144.89 · How do I close my Class V injection well?
- 40 CFR 145.1 · Purpose and scope.
- 40 CFR 145.2 · Definitions.
- 40 CFR 145.11 · Requirements for permitting.
- 40 CFR 145.12 · Requirements for compliance evaluation programs.
- 40 CFR 145.13 · Requirements for enforcement authority.
- 40 CFR 145.14 · Sharing of information.
- 40 CFR 145.21 · General requirements for program approvals.
- 40 CFR 145.22 · Elements of a program submission.
- 40 CFR 145.23 · Program description.
- 40 CFR 145.24 · Attorney General's statement.
- 40 CFR 145.25 · Memorandum of Agreement with the Regional Administrator.
- 40 CFR 145.31 · Approval process.
- 40 CFR 145.32 · Procedures for revision of State programs.
- 40 CFR 145.33 · Criteria for withdrawal of State programs.
- 40 CFR 145.34 · Procedures for withdrawal of State programs.
- 40 CFR 145.52 · Requirements for Tribal eligibility.
- 40 CFR 145.56 · Request by an Indian Tribe for a determination of eligibility.
- 40 CFR 145.58 · Procedure for processing an Indian Tribe's application.
- 40 CFR 146.1 · Applicability and scope.
- 40 CFR 146.2 · Law authorizing these regulations.
- 40 CFR 146.3 · Definitions.
- 40 CFR 146.4 · Criteria for exempted aquifers.
- 40 CFR 146.5 · Classification of injection wells.
- 40 CFR 146.6 · Area of review.
- 40 CFR 146.7 · Corrective action.
- 40 CFR 146.8 · Mechanical integrity.
- 40 CFR 146.9 · Criteria for establishing permitting priorities.
- 40 CFR 146.10 · Plugging and abandoning Class I, II, III, IV, and V wells.
- 40 CFR 146.11 · Criteria and standards applicable to Class I nonhazardous wells.
- 40 CFR 146.12 · Construction requirements.
- 40 CFR 146.13 · Operating, monitoring and reporting requirements.
- 40 CFR 146.14 · Information to be considered by the Director.
- 40 CFR 146.15 · Class I municipal disposal well alternative authorization in certain parts of Florida.
- 40 CFR 146.16 · Requirements for new Class I municipal wells in certain parts of Florida.
- 40 CFR 146.21 · Applicability.
- 40 CFR 146.22 · Construction requirements.
- 40 CFR 146.23 · Operating, monitoring, and reporting requirements.
- 40 CFR 146.24 · Information to be considered by the Director.
- 40 CFR 146.31 · Applicability.
- 40 CFR 146.32 · Construction requirements.
- 40 CFR 146.33 · Operating, monitoring, and reporting requirements.
- 40 CFR 146.34 · Information to be considered by the Director.
- 40 CFR 146.51 · Applicability.
- 40 CFR 146.61 · Applicability.
- 40 CFR 146.62 · Minimum criteria for siting.
- 40 CFR 146.63 · Area of review.
- 40 CFR 146.64 · Corrective action for wells in the area of review.
- 40 CFR 146.65 · Construction requirements.
- 40 CFR 146.66 · Logging, sampling, and testing prior to new well operation.
- 40 CFR 146.67 · Operating requirements.
- 40 CFR 146.68 · Testing and monitoring requirements.
- 40 CFR 146.69 · Reporting requirements.
- 40 CFR 146.70 · Information to be evaluated by the Director.
- 40 CFR 146.71 · Closure.
- 40 CFR 146.72 · Post-closure care.
- 40 CFR 146.73 · Financial responsibility for post-closure care.
- 40 CFR 146.81 · Applicability.
- 40 CFR 146.82 · Required Class VI permit information.
- 40 CFR 146.83 · Minimum criteria for siting.
- 40 CFR 146.84 · Area of review and corrective action.
- 40 CFR 146.85 · Financial responsibility.
- 40 CFR 146.86 · Injection well construction requirements.
- 40 CFR 146.87 · Logging, sampling, and testing prior to injection well operation.
- 40 CFR 146.88 · Injection well operating requirements.
- 40 CFR 146.89 · Mechanical integrity.
- 40 CFR 146.90 · Testing and monitoring requirements.