Browse Federal regulations
Read the original sections, or search by topic.
- 10 CFR 62.12 · Contents of a request for emergency access: General information.
- 10 CFR 62.13 · Contents of a request for emergency access: Alternatives.
- 10 CFR 62.14 · Contents of a request for an extension of emergency access.
- 10 CFR 62.15 · Additional information.
- 10 CFR 62.16 · Withdrawal of a determination request.
- 10 CFR 62.17 · Elimination of repetition.
- 10 CFR 62.18 · Denial of request.
- 10 CFR 62.21 · Determination for granting emergency access.
- 10 CFR 62.22 · Notice of issuance of a determination.
- 10 CFR 62.23 · Determination for granting temporary emergency access.
- 10 CFR 62.24 · Extension of emergency access.
- 10 CFR 62.25 · Criteria for a Commission determination.
- 10 CFR 62.26 · Criteria for designating a disposal facility.
- 10 CFR 62.31 · Termination of emergency access.
- 10 CFR 63.1 · Purpose and scope.
- 10 CFR 63.2 · Definitions.
- 10 CFR 63.3 · License required.
- 10 CFR 63.4 · Communications and records.
- 10 CFR 63.5 · Interpretations.
- 10 CFR 63.6 · Exemptions.
- 10 CFR 63.7 · License not required for certain preliminary activities.
- 10 CFR 63.8 · Information collection requirements: OMB approval.
- 10 CFR 63.9 · Employee protection.
- 10 CFR 63.10 · Completeness and accuracy of information.
- 10 CFR 63.11 · Deliberate misconduct.
- 10 CFR 63.15 · Site characterization.
- 10 CFR 63.16 · Review of site characterization activities. 2
- 10 CFR 63.21 · Content of application.
- 10 CFR 63.22 · Filing and distribution of application.
- 10 CFR 63.23 · Elimination of repetition.
- 10 CFR 63.24 · Updating of application and environmental impact statement.
- 10 CFR 63.31 · Construction authorization.
- 10 CFR 63.32 · Conditions of construction authorization.
- 10 CFR 63.33 · Amendment of construction authorization.
- 10 CFR 63.41 · Standards for issuance of a license.
- 10 CFR 63.42 · Conditions of license.
- 10 CFR 63.43 · License specification.
- 10 CFR 63.44 · Changes, tests, and experiments.
- 10 CFR 63.45 · Amendment of license.
- 10 CFR 63.46 · Particular activities requiring license amendment.
- 10 CFR 63.47 · Facility information and verification.
- 10 CFR 63.51 · License amendment for permanent closure.
- 10 CFR 63.52 · Termination of license.
- 10 CFR 63.61 · Provision of information.
- 10 CFR 63.62 · Site review.
- 10 CFR 63.63 · Participation in license reviews.
- 10 CFR 63.64 · Notice to State.
- 10 CFR 63.65 · Representation.
- 10 CFR 63.71 · Records and reports.
- 10 CFR 63.72 · Construction records.
- 10 CFR 63.73 · Reports of deficiencies.
- 10 CFR 63.74 · Tests.
- 10 CFR 63.75 · Inspections.
- 10 CFR 63.78 · Material control and accounting records and reports.
- 10 CFR 63.101 · Purpose and nature of findings.
- 10 CFR 63.102 · Concepts.
- 10 CFR 63.111 · Performance objectives for the geologic repository operations area through permanent closure.
- 10 CFR 63.112 · Requirements for preclosure safety analysis of the geologic repository operations area.
- 10 CFR 63.113 · Performance objectives for the geologic repository after permanent closure.
- 10 CFR 63.114 · Requirements for performance assessment.
- 10 CFR 63.115 · Requirements for multiple barriers.
- 10 CFR 63.121 · Requirements for ownership and control of interests in land.
- 10 CFR 63.131 · General requirements.
- 10 CFR 63.132 · Confirmation of geotechnical and design parameters.
- 10 CFR 63.133 · Design testing.
- 10 CFR 63.134 · Monitoring and testing waste packages.
- 10 CFR 63.141 · Scope.
- 10 CFR 63.142 · Quality assurance criteria.
- 10 CFR 63.143 · Implementation.
- 10 CFR 63.144 · Quality assurance program change.
- 10 CFR 63.151 · General requirements.
- 10 CFR 63.152 · Training and certification program.
- 10 CFR 63.153 · Physical requirements.
- 10 CFR 63.161 · Emergency plan for the geologic repository operations area through permanent closure.
- 10 CFR 63.171 · Violations.
- 10 CFR 63.172 · Criminal penalties.
- 10 CFR 63.201 · Purpose and scope.
- 10 CFR 63.202 · Definitions for subpart K.
- 10 CFR 63.203 · Implementation of subpart K.
- 10 CFR 63.204 · Preclosure standard.
- 10 CFR 63.301 · Purpose and scope.
- 10 CFR 63.302 · Definitions for subpart L.
- 10 CFR 63.303 · Implementation of subpart L.
- 10 CFR 63.304 · Reasonable expectation.
- 10 CFR 63.305 · Required characteristics of the reference biosphere.
- 10 CFR 63.311 · Individual protection standard after permanent closure.
- 10 CFR 63.312 · Required characteristics of the reasonably maximally exposed individual.
- 10 CFR 63.321 · Individual protection standard for human intrusion.
- 10 CFR 63.322 · Human intrusion scenario.
- 10 CFR 63.331 · Separate standards for protection of groundwater.
- 10 CFR 63.332 · Representative volume.
- 10 CFR 63.342 · Limits on performance assessments.
- 10 CFR 63.343 · Severability of individual protection and groundwater protection standards.
- 10 CFR 70.1 · Purpose.
- 10 CFR 70.2 · Scope.
- 10 CFR 70.3 · License requirements.
- 10 CFR 70.4 · Definitions.
- 10 CFR 70.5 · Communications.
- 10 CFR 70.6 · Interpretations.
- 10 CFR 70.7 · Employee protection.