Browse Federal regulations
Read the original sections, or search by topic.
- 18 CFR 284.262 · Definitions.
- 18 CFR 284.263 · Exemption from section 7 of Natural Gas Act and certain regulatory conditions.
- 18 CFR 284.264 · Terms and conditions.
- 18 CFR 284.265 · Cost recovery by interstate pipeline.
- 18 CFR 284.266 · Rates and charges for interstate pipelines.
- 18 CFR 284.267 · Intrastate pipeline emergency transportation rates.
- 18 CFR 284.268 · Local distribution company emergency transportation rates.
- 18 CFR 284.269 · Intrastate pipeline and local distribution company emergency sales rates.
- 18 CFR 284.270 · Reporting requirements.
- 18 CFR 284.271 · Waiver.
- 18 CFR 284.281 · Applicability.
- 18 CFR 284.282 · Definitions.
- 18 CFR 284.283 · Point of unbundling.
- 18 CFR 284.284 · Blanket certificates for unbundled sales services.
- 18 CFR 284.285 · Pregrant of abandonment of unbundled sales services.
- 18 CFR 284.286 · Standards of conduct for unbundled sales service.
- 18 CFR 284.287 · Implementation and effective date.
- 18 CFR 284.288 · Code of conduct for unbundled sales service.
- 18 CFR 284.301 · Applicability.
- 18 CFR 284.302 · Definitions.
- 18 CFR 284.303 · OCS blanket certificates.
- 18 CFR 284.401 · Definitions.
- 18 CFR 284.402 · Blanket marketing certificates.
- 18 CFR 284.403 · Code of conduct for persons holding blanket marketing certificates.
- 18 CFR 284.501 · Applicability.
- 18 CFR 284.502 · Procedures for applying for market-based rates.
- 18 CFR 284.503 · Market-power determination.
- 18 CFR 284.504 · Standard requirements for market-power authorizations.
- 18 CFR 284.505 · Market-based rates for storage providers without a market-power determination.
- 18 CFR 286.101 · Application for stay.
- 18 CFR 286.102 · Application for rehearing.
- 18 CFR 286.103 · Notice to audited person.
- 18 CFR 286.104 · Response to notification.
- 18 CFR 286.105 · Shortened procedure.
- 18 CFR 286.106 · Form and style.
- 18 CFR 286.107 · Verification.
- 18 CFR 286.108 · Determination.
- 18 CFR 286.109 · Assignment for oral hearing.
- 18 CFR 287.101 · Determination of powerplant design capacity.
- 18 CFR 290.101 · Applicability and exemptions.
- 18 CFR 290.102 · Information gathering and filing.
- 18 CFR 290.103 · Time of filing and reporting period.
- 18 CFR Appendix A to Part 290 · Appendix A to Part 290—Nonexempt Electric Utilities
- 18 CFR 292.101 · Definitions.
- 18 CFR 292.201 · Scope.
- 18 CFR 292.202 · Definitions.
- 18 CFR 292.203 · General requirements for qualification.
- 18 CFR 292.204 · Criteria for qualifying small power production facilities.
- 18 CFR 292.205 · Criteria for qualifying cogeneration facilities.
- 18 CFR 292.207 · Procedures for obtaining qualifying status.
- 18 CFR 292.208 · Special requirements for hydroelectric small power production facilities located at a new dam or diversion.
- 18 CFR 292.209 · Exceptions from requirements for hydroelectric small power production facilities located at a new dam or diversion.
- 18 CFR 292.210 · Petition alleging commitment of substantial monetary resources before October 16, 1986.
- 18 CFR 292.211 · Petition for initial determination on whether a project has a substantial adverse effect on the environment (AEE petition).
- 18 CFR 292.301 · Scope.
- 18 CFR 292.302 · Availability of electric utility system cost data.
- 18 CFR 292.303 · Electric utility obligations under this subpart.
- 18 CFR 292.304 · Rates for purchases.
- 18 CFR 292.305 · Rates for sales.
- 18 CFR 292.306 · Interconnection costs.
- 18 CFR 292.307 · System emergencies.
- 18 CFR 292.308 · Standards for operating reliability.
- 18 CFR 292.309 · Termination of obligation to purchase from qualifying facilities.
- 18 CFR 292.310 · Procedures for utilities requesting termination of obligation to purchase from qualifying facilities.
- 18 CFR 292.311 · Reinstatement of obligation to purchase.
- 18 CFR 292.312 · Termination of obligation to sell to qualifying facilities.
- 18 CFR 292.313 · Reinstatement of obligation to sell.
- 18 CFR 292.314 · Existing rights and remedies.
- 18 CFR 292.401 · Implementation of certain reporting requirements.
- 18 CFR 292.402 · Waivers.
- 18 CFR 292.601 · Exemption to qualifying facilities from the Federal Power Act.
- 18 CFR 292.602 · Exemption to qualifying facilities from the Public Utility Holding Company Act of 2005 and certain State laws and regulations.
- 18 CFR 294.101 · Shortages of electric energy and capacity.
- 18 CFR 300.1 · Applicability and definitions.
- 18 CFR 300.2 · Informal conference.
- 18 CFR 300.10 · Application for confirmation and approval.
- 18 CFR 300.11 · Technical support for the rate schedule.
- 18 CFR 300.12 · Analysis of supporting data.
- 18 CFR 300.13 · Waiver of filing requirements.
- 18 CFR 300.14 · Filings under section 7(k).
- 18 CFR 300.20 · Interim acceptance and review of Bonneville Power Administration rates.
- 18 CFR 300.21 · Final confirmation and approval.
- 18 CFR 301.1 · Applicability.
- 18 CFR 301.2 · Definitions.
- 18 CFR 301.3 · Filing procedures.
- 18 CFR 301.4 · Exchange Period Average System Cost determination.
- 18 CFR 301.5 · Changes in Average System Cost methodology.
- 18 CFR 301.6 · Appendix 1 instructions.
- 18 CFR 301.7 · Average System Cost methodology functionalization.
- 18 CFR Table 1 to Part 301 · Table 1 to Part 301—Functionalization and Escalation Codes
- 18 CFR Appendix 1 to Part 301 · Appendix 1 to Part 301—ASC Utility Filing Template
- 18 CFR 340.1 · Suspended rate schedules; procedure; refund requirement; administered by the Federal Energy Regulatory Commission.
- 18 CFR 341.0 · Definitions; application.
- 18 CFR 341.1 · Electronic filing of tariffs and related materials.
- 18 CFR 341.2 · Filing requirements.
- 18 CFR 341.3 · Form of tariff.
- 18 CFR 341.4 · Amendments of tariff filings.
- 18 CFR 341.5 · Cancellation of tariffs.
- 18 CFR 341.6 · Adoption of tariff by a successor.
- 18 CFR 341.7 · Concurrences.