Browse Federal regulations
Read the original sections, or search by topic.
- 23 CFR 661.23 · How will a bridge project be programmed for funding once eligibility has been determined?
- 23 CFR 661.25 · What does a complete application package for PE consist of and how does the project receive funding?
- 23 CFR 661.27 · What does a complete application package for construction consist of and how does the project receive funding?
- 23 CFR 661.29 · How does ownership impact project selection?
- 23 CFR 661.31 · Do TTF bridge projects have to be listed on an approved TTP TIP?
- 23 CFR 661.33 · What percentage of TTFBP funding is available for PE and construction?
- 23 CFR 661.35 · What percentage of TTFBP funding is available for use on BIA and Tribally owned TTF bridges, and for non-BIA/non-Tribally owned TTF bridges?
- 23 CFR 661.37 · What are the funding limitations on an individual TTF bridge project?
- 23 CFR 661.39 · How are project cost overruns funded?
- 23 CFR 661.41 · After a bridge project has been completed (either PE or construction) what happens with the excess or surplus funding?
- 23 CFR 661.43 · Can other sources of funds be used to finance a queued project in advance of receipt of TTFBP funds?
- 23 CFR 661.45 · What happens when TTFBP funds cannot be obligated by the end of the fiscal year?
- 23 CFR 661.47 · Can routine bridge maintenance be performed with TTFBP funds?
- 23 CFR 661.49 · Can TTFBP funds be spent on Interstate, State Highway, County, City, Township, and Toll Road TTF bridges?
- 23 CFR 661.51 · Can TTFBP funds be used for the approach roadway to a bridge?
- 23 CFR 661.53 · What standards should be used for bridge design?
- 23 CFR 661.55 · How are BIA and Tribally owned in-service TTF bridges inspected?
- 23 CFR 661.57 · What should be done with a BIA and Tribal bridge in poor condition if the Indian Tribe does not support the project?
- 23 CFR 667.1 · Statewide evaluation.
- 23 CFR 667.3 · Definitions.
- 23 CFR 667.5 · Data time period, availability, and sources.
- 23 CFR 667.7 · Timing of evaluations.
- 23 CFR 667.9 · Consideration of evaluations.
- 23 CFR 668.101 · Purpose.
- 23 CFR 668.103 · Definitions.
- 23 CFR 668.105 · Policy.
- 23 CFR 668.107 · Federal share payable.
- 23 CFR 668.109 · Eligibility.
- 23 CFR 668.111 · Application procedures.
- 23 CFR 668.113 · Program and project procedures.
- 23 CFR 668.201 · Purpose.
- 23 CFR 668.203 · Definitions.
- 23 CFR 668.205 · Policy.
- 23 CFR 668.207 · Federal share payable from emergency fund.
- 23 CFR 668.209 · Eligibility of work.
- 23 CFR 668.211 · Notification, damage assessment, and finding.
- 23 CFR 668.213 · Application procedures.
- 23 CFR 668.215 · Programming and project procedures.
- 23 CFR 669.1 · Scope and purpose.
- 23 CFR 669.3 · Policy.
- 23 CFR 669.5 · Objective.
- 23 CFR 669.7 · Certification requirement.
- 23 CFR 669.9 · Certification content.
- 23 CFR 669.11 · Certification submittal.
- 23 CFR 669.13 · Effect of failure to certify or to adequately obtain proof-of-payment.
- 23 CFR 669.15 · Procedure for the reduction of funds.
- 23 CFR 669.17 · Compliance finding.
- 23 CFR 669.19 · Reservation and reapportionment of funds.
- 23 CFR 669.21 · Procedure for evaluating state compliance.
- 23 CFR 680.100 · Purpose.
- 23 CFR 680.102 · Applicability.
- 23 CFR 680.104 · Definitions.
- 23 CFR 680.106 · Installation, operation, and maintenance by qualified technicians of electric vehicle charging infrastructure.
- 23 CFR 680.108 · Interoperability of electric vehicle charging infrastructure.
- 23 CFR 680.110 · Traffic control devices or on-premises signs acquired, installed, or operated.
- 23 CFR 680.112 · Data submittal.
- 23 CFR 680.114 · Charging network connectivity of electric vehicle charging infrastructure.
- 23 CFR 680.116 · Information on publicly available electric vehicle charging infrastructure locations, pricing, real time availability, and accessibility through mapping.
- 23 CFR 680.118 · Other Federal requirements.
- 23 CFR 710.101 · Purpose.
- 23 CFR 710.103 · Applicability.
- 23 CFR 710.105 · Definitions.
- 23 CFR 710.201 · Grantee and subgrantee responsibilities.
- 23 CFR 710.203 · Title 23 funding and reimbursement.
- 23 CFR 710.301 · General.
- 23 CFR 710.303 · Project authorization and agreements.
- 23 CFR 710.305 · Acquisition.
- 23 CFR 710.307 · Construction advertising.
- 23 CFR 710.309 · Design-build projects.
- 23 CFR 710.401 · General.
- 23 CFR 710.403 · Management.
- 23 CFR 710.405 · ROW use agreements.
- 23 CFR 710.407 · [Reserved]
- 23 CFR 710.409 · Disposal of excess real property.
- 23 CFR 710.501 · Early acquisition.
- 23 CFR 710.503 · Protective buying and hardship acquisition.
- 23 CFR 710.505 · Real property donations.
- 23 CFR 710.507 · State and local contributions.
- 23 CFR 710.509 · Functional replacement of real property in public ownership.
- 23 CFR 710.511 · Transportation Alternatives.
- 23 CFR 710.601 · Federal land transfers.
- 23 CFR 710.603 · Direct Federal acquisition.
- 23 CFR 710.701 · Purpose.
- 23 CFR 710.703 · Definitions.
- 23 CFR 710.705 · Applicability.
- 23 CFR 710.707 · Fair market value.
- 23 CFR 710.709 · Determination of fair market value.
- 23 CFR 750.101 · Purpose.
- 23 CFR 750.102 · Definitions.
- 23 CFR 750.103 · Measurements of distance.
- 23 CFR 750.104 · Signs that may not be permitted in protected areas.
- 23 CFR 750.105 · Signs that may be permitted in protected areas.
- 23 CFR 750.106 · Class 3 and 4 signs within informational sites.
- 23 CFR 750.107 · Class 3 and 4 signs outside informational sites.
- 23 CFR 750.108 · General provisions.
- 23 CFR 750.109 · Exclusions.
- 23 CFR 750.110 · State regulations.
- 23 CFR 750.151 · Purpose.
- 23 CFR 750.152 · Application.
- 23 CFR 750.153 · Definitions.