Browse Washington
Read the original sections, or search by topic.
- RCW 19.27A.150 · Strategic plan—Development and implementation.
- RCW 19.27A.160 · Residential and nonresidential construction—Energy consumption reduction—Council report.
- RCW 19.27A.170 · Utilities—Maintenance of records of energy consumption data—Disclosure.
- RCW 19.27A.180 · Energy performance score—Implementation strategy—Development and recommendations.
- RCW 19.27A.190 · Qualifying public agency duties—Energy benchmark—Performance rating—Reports.
- RCW 19.27A.200 · State energy performance standard—Definitions.
- RCW 19.27A.210 · State energy performance standard.
- RCW 19.27A.220 · State energy performance standard—Early adoption incentive program—Report to the legislature.
- RCW 19.27A.230 · State energy performance standard—Limit on early adoption incentive payments.
- RCW 19.27A.240 · State energy performance standard—Early adoption incentive payment administration.
- RCW 19.27A.245 · State energy performance standard—Joint legislative audit and review committee—Report. (Expires January 1, 2029.)
- RCW 19.27A.250 · State energy management and benchmarking requirement.
- RCW 19.27A.260 · Campus energy system decarbonization plan—Definitions—Report—Alternative compliance pathway.
- RCW 19.27A.270 · New housing in existing buildings—Adoption of rule.
- RCW 19.28.006 · Definitions.
- RCW 19.28.010 · Electrical wiring requirements—General—Exceptions.
- RCW 19.28.021 · Disputes regarding local regulations—Arbitration—Appeal.
- RCW 19.28.031 · Rules, regulations, and standards.
- RCW 19.28.041 · License required—General or specialty licenses—Fees—Application—Bond or cash deposit.
- RCW 19.28.051 · Examinations—Fees.
- RCW 19.28.061 · Electrical contractors—Designee of firm to take master electrician or administrator's examination—Administrator's certificate—Fee—Certificate duration, denial, renewal, nontransferable—Master electrician or administrator's duties.
- RCW 19.28.071 · Licensee's bond—Action on—Priorities—Cash deposit, payment from.
- RCW 19.28.081 · Actions—Local permits—Proof of licensure.
- RCW 19.28.091 · Licensing—Exemptions.
- RCW 19.28.095 · Equipment repair specialty—Scope of work.
- RCW 19.28.101 · Inspections—Notice to repair and change—Disconnection—Entry—Concealment—Accessibility—Connection to utility—Permits, fees—Limitation—Waiver of provisions during state of emergency.
- RCW 19.28.111 · Nonconforming installations—Disputes—Reference to board.
- RCW 19.28.121 · Board—Request for ruling—Fee—Costs.
- RCW 19.28.131 · Specialty electrical contractor license—Written warning, penalty—Violations of RCW 19.28.010 through 19.28.141 and 19.28.311 through 19.28.361—Schedule of penalties—Appeal.
- RCW 19.28.141 · RCW 19.28.101 inapplicable in certain cities and towns, electricity supply agency service areas, and rights-of-way of state highways.
- RCW 19.28.151 · RCW 19.28.010 through 19.28.141 and 19.28.311 through 19.28.361 inapplicable to telegraph or telephone companies exercising certain functions.
- RCW 19.28.161 · Certification—Apprentices and trainees—Supervision—Ratio of noncertified and certified workers—Trainee hours verification.
- RCW 19.28.171 · Electrical trainee hours—Audit—Rules—Confidentiality.
- RCW 19.28.181 · Application for certificate of competency.
- RCW 19.28.191 · Certificate of competency—Eligibility for examination—Rules.
- RCW 19.28.201 · Examination—Times—Certification of results—Contents—Fees.
- RCW 19.28.205 · In-class education requirements.
- RCW 19.28.211 · Certificate of competency—Issuance—Renewal—Continuing education—Fees—Effect.
- RCW 19.28.221 · Persons engaged in trade or business on July 16, 1973.
- RCW 19.28.231 · Temporary permits.
- RCW 19.28.241 · Revocation of certificate of competency—Grounds—Procedure.
- RCW 19.28.251 · Powers and duties of director—Administration of RCW 19.28.161 through 19.28.271 by the department.
- RCW 19.28.261 · Exemptions from RCW 19.28.161 through 19.28.271.
- RCW 19.28.265 · Licensing, certification, and inspection—Exemptions—Modifications—Industrial equipment defined.
- RCW 19.28.271 · Violations of RCW 19.28.161 through 19.28.271—Schedule of penalties—Appeal.
- RCW 19.28.281 · Electric vehicle infrastructure—Rule adoption.
- RCW 19.28.285 · Electric vehicle supply equipment installation—Certification.
- RCW 19.28.291 · Violations of chapter—Issuance of subpoenas—Application.
- RCW 19.28.301 · Application—Subchapter heading.
- RCW 19.28.311 · Electrical board.
- RCW 19.28.321 · Enforcement—State electrical inspectors—Qualifications—Salaries and expenses.
- RCW 19.28.325 · Enforcement—Local authority—Penalties—Appeals.
- RCW 19.28.331 · Inspection reports.
- RCW 19.28.341 · Revocation or suspension of license—Grounds—Appeal to board—Fee—Costs.
- RCW 19.28.351 · Electrical license fund.
- RCW 19.28.361 · Liability for injury or damage.
- RCW 19.28.371 · Medical device—Installation, maintenance, or repair—Compliance with chapter—Limit of exemption.
- RCW 19.28.381 · Denial of renewal of certificate or license for outstanding penalties—Notice—Appeal—Hearing.
- RCW 19.28.400 · Definitions.
- RCW 19.28.410 · Telecommunications systems installations—Subject to this subchapter.
- RCW 19.28.420 · Telecommunications contractor license—Application—Bond—Issuance of license.
- RCW 19.28.430 · Administrator's examination—Certificate—Administrator's requirements.
- RCW 19.28.440 · Examination for telecommunications administrators' certificates.
- RCW 19.28.450 · Local enforcement of subchapter—Enforcement of chapter.
- RCW 19.28.460 · Disputes regarding local regulations—Arbitration—Panel.
- RCW 19.28.470 · Inspections—Report—Required repairs/changes—Accessibility of telecommunications systems.
- RCW 19.28.480 · Unlawful acts—Interpretation of chapter.
- RCW 19.28.490 · Violation of chapter—Penalty—Appeal.
- RCW 19.28.501 · Insurance/financial responsibility.
- RCW 19.28.511 · Individual certification not required.
- RCW 19.28.521 · Limitation of action—Proof of valid license required.
- RCW 19.28.531 · Unlawful installation/maintenance—Disputed interpretation—Board to determine methods.
- RCW 19.28.541 · Entity desiring board decision—Process.
- RCW 19.28.551 · Director's authority—Adoption of rules.
- RCW 19.28.910 · Effective date—1963 c 207.
- RCW 19.280.010 · Intent—Finding.
- RCW 19.280.020 · Definitions.
- RCW 19.280.030 · Development of a resource plan—Requirements of a resource plan—Clean energy action plan.
- RCW 19.280.040 · Investor-owned utilities submit integrated resource plans to the commission—Rules.
- RCW 19.280.050 · Consumer-owned utilities.
- RCW 19.280.065 · Department and commission meeting—Summary to the governor and legislature. (Expires January 1, 2031.)
- RCW 19.280.070 · Combined heat and power systems—Valuation—Assessment.
- RCW 19.280.080 · Combined heat and power systems—Power purchase agreements.
- RCW 19.280.090 · Combined heat and power systems—Report to the legislature.
- RCW 19.280.100 · Distributed energy resources planning.
- RCW 19.280.110 · Transmission services—Consideration to conditional firm service.
- RCW 19.285.010 · Intent.
- RCW 19.285.020 · Declaration of policy.
- RCW 19.285.030 · Definitions.
- RCW 19.285.040 · Energy conservation and renewable energy targets.
- RCW 19.285.045 · Energy conservation and renewable energy targets—Analysis and advisory opinion.
- RCW 19.285.050 · Resource costs.
- RCW 19.285.060 · Accountability and enforcement.
- RCW 19.285.070 · Reporting and public disclosure.
- RCW 19.285.080 · Rule making.
- RCW 19.285.900 · Construction—2007 c 1 (Initiative Measure No. 937).
- RCW 19.285.902 · Short title—2007 c 1 (Initiative Measure No. 937).
- RCW 19.29.010 · Rules for use of electrical apparatus or construction.
- RCW 19.29.020 · Copy of chapter to be posted.
- RCW 19.29.030 · Time for compliance.