AS 09.45.894: Additional construction defects; additional notice of claim required.
Where this section sits in the code
- Title 9. Code of Civil Procedure.
- Chapter 45. Actions Relating to Real Property.
- Article 11. Action for Dwelling Design, Construction, or Remodeling Claims.
A court action for a defect that is discovered after a claimant has provided a construction professional with a notice of claim required in AS 09.45.881 — 09.45.899 may not be commenced until the claimant has complied with the provisions of AS 09.45.881 — 09.45.899.
Collected 2026-09-02T06:16:32Z. Source file · JSON