GroundRules
← Search the law
Arkansas · Snapshot open-us-law v2026.08, retrieved 2026-09-14

Ark. Code Ann. § 23-10-425: Loading or unloading - Additional free time when weather inclement

Read at publisher ↗
Where this section sits in the code
  1. AR Code
  2. Title 23
  3. Chapter 10
  4. Subchapter 4

Whenever the weather, during the period of free time, is so severe, inclement, or rainy that it is impossible or impracticable to secure means of loading or unloading freight, or when, from the nature of the goods, loading or unloading would cause injury or damage, then additional time shall be added to the free period, and no demurrage charges shall be allowed for the additional free time. This applies to the state of the weather during business hours.

Collected 2026-09-14T18:32:41Z. Source file · JSON

Browse this collection