GroundRules
← Search the law
California · Through 2026-09-13

HSC § 25201.12

Read at publisher ↗
Where this section sits in the code
  1. Health and Safety Code - HSC
  2. DIVISION 20. MISCELLANEOUS HEALTH AND SAFETY PROVISIONS [24000. - 28002.]
  3. CHAPTER 6.5. Hazardous Waste Control [25100. - 25259.]
  4. ARTICLE 9. Permitting of Facilities [25200. - 25205.]

Notwithstanding any other provision of law, a hazardous waste facilities permit or other grant of authorization from the department, and payment of any fee imposed pursuant to Article 9.1 (commencing with Section 25205.1), are not required for a facility, with regard to the facility’s operation of a physical process to remove air pollutants from exhaust gases prior to their emission to the atmosphere, as permitted by an air pollution control district or an air quality management district, unless a permit is required for that operation pursuant to the federal act. However, the facility is subject to all requirements imposed pursuant to this chapter on hazardous waste generators with regard to any liquid, semisolid, or solid hazardous waste that is generated as part of, and upon its removal from, the air pollution control process.

Collected 2026-09-14T05:56:33Z. Source file · JSON

Browse this collection