HSC § 41903
Where this section sits in the code
- Health and Safety Code - HSC
- DIVISION 26. AIR RESOURCES [39000. - 44475.3.]
- PART 4. NONVEHICULAR AIR POLLUTION CONTROL [41500. - 42710.]
- CHAPTER 3. Emission Limitations [41700. - 41999.]
- ARTICLE 4. Sandblasting [41901. - 41905.]
Thirty days after the adoption of air pollution standards for sandblasting operations, the committee shall adjourn. Thereafter, it may meet at least once annually upon the call of the chairman of the committee to review the standards in light of changes in sandblasting technology.
Collected 2026-09-14T05:56:33Z. Source file · JSON