PCC § 21289
Where this section sits in the code
- Public Contract Code - PCC
- DIVISION 2. GENERAL PROVISIONS [1100. - 22355.]
- PART 3. CONTRACTING BY LOCAL AGENCIES [20100. - 22199.6.]
- CHAPTER 1.5. Water District Acts [20930. - 21641.]
- ARTICLE 95. Santa Cruz County Flood Control and Water Conservation District [21280. - 21297.]
If the board is advised by its engineer, or by the county surveyor or engineer, that any facility can be constructed or repaired for a sum less than the lowest responsible bid, it may reject all bids and order the work done by day’s work under the supervision and direction of the county surveyor or engineer or its engineer as determined by the board.
Collected 2026-09-14T05:56:33Z. Source file · JSON