PCC § 22167
Where this section sits in the code
- Public Contract Code - PCC
- DIVISION 2. GENERAL PROVISIONS [1100. - 22355.]
- PART 3. CONTRACTING BY LOCAL AGENCIES [20100. - 22199.6.]
- CHAPTER 4. Local Agency Design-Build Projects [22160. - 22169.]
(a) If the local agency elects to award a project pursuant to this article, retention proceeds withheld by the local agency from the design-build entity shall not exceed 5 percent if a performance and payment bond, issued by an admitted surety insurer, is required in the solicitation of bids.
(b) In a contract between the design-build entity and a subcontractor, and in a contract between a subcontractor and any subcontractor thereunder, the percentage of the retention proceeds withheld may not exceed the percentage specified in the contract between the local agency and the design-build entity. If the design-build entity provides written notice to any subcontractor that is not a member of the design-build entity, prior to or at the time the bid is requested, that a bond may be required and the subcontractor subsequently is unable or refuses to furnish a bond to the design-build entity, then the design-build entity may withhold retention proceeds in excess of the percentage specified in the contract between the local agency and the design-build entity from any payment made by the design-build entity to the subcontractor.
Collected 2026-09-14T05:56:33Z. Source file · JSON