GroundRules
← Search the law
California · Through 2026-09-13

PRC § 25123

Read at publisher ↗
Where this section sits in the code
  1. Public Resources Code - PRC
  2. DIVISION 15. ENERGY CONSERVATION AND DEVELOPMENT [25000. - 25997.7.]
  3. CHAPTER 2. Definitions [25100. - 25142.]

“Modification of an existing facility” means any alteration, replacement, or improvement of equipment that results in a 50-megawatt or more increase in the electric generating capacity of an existing thermal powerplant or an increase of 25 percent in the peak operating voltage or peak kilowatt capacity of an existing electric transmission line.

Collected 2026-09-14T05:56:33Z. Source file · JSON

Browse this collection