GroundRules
← Search the law
California · Through 2026-09-13

PRC § 3316.8

Read at publisher ↗
Where this section sits in the code
  1. Public Resources Code - PRC
  2. DIVISION 3. OIL AND GAS [3000. - 3865.]
  3. CHAPTER 1. Oil and Gas Conservation [3000. - 3473.]
  4. ARTICLE 5.5. Subsidence [3315. - 3347.]

“Fieldwide repressuring plan” means a plan based upon a competent engineering study or studies, prepared by a petroleum engineer licensed by the State, of all the pools in a field, designed so as to provide for a program of pressure restoration or maintenance as to most effectively arrest or ameliorate subsidence with respect to those land areas referred to in Section 3315.

Collected 2026-09-14T05:56:33Z. Source file · JSON

Browse this collection