GroundRules
← Search the law
California · Through 2026-09-13

PRC § 3907

Read at publisher ↗
Where this section sits in the code
  1. Public Resources Code - PRC
  2. DIVISION 3.5. MINES AND MINING [3900. - 3985.]
  3. CHAPTER 1. Manner of Locating Mining Claims, Tunnel Rights, and Millsites [3900. - 3924.]

The boundary lines of the tunnel shall be established by conspicuous and substantial monuments placed along the lines on the surface at an interval of not more than 600 feet from the face or point of commencement of the tunnel to the terminus of 3,000 feet therefrom.

Collected 2026-09-14T05:56:33Z. Source file · JSON

Browse this collection