SHC § 25151
Where this section sits in the code
- Streets and Highways Code - SHC
- DIVISION 16. HIGHWAY DISTRICTS [25000. - 27567.]
- PART 1. JOINT HIGHWAY DISTRICTS [25000. - 25521.]
- CHAPTER 7. Preliminary Surveys and Report of District Projects [25150. - 25155.]
The district engineer shall make a preliminary report to the board of directors setting forth the result of his preliminary surveys and showing the tentative location of the highway or highways proposed to be improved together with an estimate of the approximate cost of improvement, the incidental expenses thereof and the estimated cost of the acquisition of any necessary property or rights of way therefor.
Collected 2026-09-14T05:56:33Z. Source file · JSON