GroundRules
← Search the law
California · Through 2026-09-13

WAT § 13896.7

Read at publisher ↗
Where this section sits in the code
  1. Water Code - WAT
  2. DIVISION 7. WATER QUALITY [13000. - 16201.]
  3. CHAPTER 10.7. California Safe Drinking Water Bond Law of 1986 [13895. - 13898.5.]

Preliminary design work, including a cost estimate for the project, shall be completed before a loan or grant is awarded. Operation and maintenance costs shall be the responsibility of the supplier and may not be considered as part of the project cost. Costs for planning and preliminary engineering studies may be reimbursed following the receipt of a loan or grant, subject to approval by the department and the State Department of Health Services.

Collected 2026-09-14T05:56:33Z. Source file · JSON

Browse this collection