GroundRules
← Search the law
Colorado · Through Colorado Revised Statutes 2026

C.R.S. § 25-8.5-115: Facilities - comprehensive program.

Read at publisher ↗
Where this section sits in the code
  1. Title 25 - PUBLIC HEALTH AND ENVIRONMENT
  2. Article 8.5 - Cherry Creek Basin Water Quality Authority

(1) The authority, acting by and through the board, may acquire, construct, lease, rent, improve, equip, relocate, maintain, and operate water quality control facilities, any project, or any part thereof for the benefit of the authority and the inhabitants thereof, after the board has made such preliminary studies and otherwise taken such action as it determines to be necessary or desirable.

(2) (a) The authority shall develop a comprehensive program for the water quality control facilities specified in subsection (1) of this section. A comprehensive program may consist of one project or more than one project.

(b) A hearing on the proposed comprehensive program shall be scheduled, and notice of the hearing shall be given by publication and posted in the office of the county clerk and recorder of each member county. Upon closure of the hearing, the board may either require changes to be made in the comprehensive program or the board may approve or reject the comprehensive program as prepared.

(c) If any substantial changes to the comprehensive program are ordered at any time, a further hearing shall be held pursuant to notice which shall be given by publication.

Collected 2026-09-14T18:37:45Z. Source file · JSON

Browse this collection