C.R.S. § 43-1-1311: Survey required - railroad track removal.
Where this section sits in the code
- Title 43 - TRANSPORTATION
- Article 1 - General and Administrative
- Part 13 - ACQUISITION OF ABANDONED RAILROAD RIGHTS-OF-WAY
(1) Before any railroad tracks are removed from abandoned railroad rights-of-way in Colorado, if a proper legal description is not available, the person or entity removing the railroad tracks shall cause a field survey of the centerline of such railroad tracks to be made by a professional land surveyor, if title to any land references such railroad tracks. The professional land surveyor shall deposit a survey plat in accordance with section 38-50-101, C.R.S., showing the following:
(a) Field-measured dimensions of the centerline of the railroad tracks; and
(b) Field-measured bearing and distance ties to public land survey monument corners so that no point on said abandoned railroad rights-of-way is further than two miles from a public land survey monument corner.
Collected 2026-09-14T18:37:45Z. Source file · JSON