GroundRules
← Search the law
Connecticut · Through Revised to January 1, 2026 (2026 Supplement to the General Statutes of Connecticut, applied over the base revision of January 1, 2025)

Conn. Gen. Stat. § 25-238a: Farmington River optimum flow. Dam release and holdback requests.

Read at publisher ↗
Where this section sits in the code
  1. TITLE 25. WATER RESOURCES. FLOOD AND EROSION CONTROL
  2. CHAPTER 485. MULTIPLE USE RIVERS

(a) The Commissioner of Energy and Environmental Protection, in consultation with the Metropolitan District Commission, shall make Colebrook River Lake Dam release and holdback requests to the United States Army Corps of Engineers, as needed, to achieve an optimum flow in the Farmington River for: (1) Fish and wildlife, (2) recreation, (3) the river's health, (4) flood risk reduction, (5) tourism, (6) hydropower, and (7) safety.

(b) Notwithstanding any provision of the general statutes or any special act, the Metropolitan District Commission shall release from the Goodwin Dam any amount of water released from the Colebrook Dam based on a request of the Commissioner of Energy and Environmental Protection in furtherance of the provisions of subsection (a) of this section.

Collected 2026-09-06T19:07:08Z. Source file · JSON

Browse this collection