GroundRules
← Search the law
Indiana · Snapshot 2026

IC 4-13.5-1.5-13: Contractor and subcontractor records

Read at publisher ↗
Where this section sits in the code
  1. TITLE 4. STATE OFFICES AND ADMINISTRATION
  2. ARTICLE 13.5. CONSTRUCTION OF STATE OFFICE BUILDINGS AND OTHER FACILITIES
  3. Chapter 1.5. Energy Cost Savings Projects

Sec. 13. (a) The contractor and each subcontractor engaged in installing energy conservation measures under a guaranteed energy cost savings contract shall keep full and accurate records indicating the names, classifications, and work performed by each worker employed by the respective contractor and subcontractor in connection with the work together with an accurate record of the number of hours worked by each worker and the actual wages paid.

(b) The payroll records required to be kept under this section must be open to inspection by an authorized representative of the commission and the department of labor.

Collected 2026-08-30T06:26:00Z. Source file · JSON

Browse this collection