GroundRules
← Search the law
Indiana · Snapshot 2026

IC 8-17-1-18: Statement; compliance with contract; materials testing engineer's report

Read at publisher ↗
Where this section sits in the code
  1. TITLE 8. UTILITIES AND TRANSPORTATION
  2. ARTICLE 17. COUNTY ROADS─ADMINISTRATION AND MAINTENANCE
  3. Chapter 1. County Unit Law

Sec. 18. Whenever any highway is completed, the inspector, surveyor, or engineer shall file a sworn statement with the county auditor stating that the highway has been completed according to plans, plats, profiles, specifications, and contract and that the quantity and quality of material used in making the improvement was as required under standards and tests of the department. A competent materials testing engineer shall determine in a report whether the tests and standards as to the quality of materials has been met. The materials testing engineer shall file a copy of the report with the county auditor.

Collected 2026-10-04T20:08:46Z. Source file · JSON

Browse this collection