IC 8-4.5-1-16: "Recreational trail"
Where this section sits in the code
- TITLE 8. UTILITIES AND TRANSPORTATION
- ARTICLE 4.5. TRANSPORTATION CORRIDOR PLANNING
- Chapter 1. Definitions
Sec. 16. "Recreational trail" means a trail or path that:
(1) includes a corridor along any part of its length;
(2) is intended to be used for:
(A) bicycling;
(B) exercising;
(C) hiking;
(D) running;
(E) riding:
(i) in or on a vehicle of any kind, regardless of the means of propelling the vehicle; or
(ii) on any animal;
(F) walking; or
(G) any other recreational purpose; and
(3) is funded through the recreational trails program under IC 8-4.5-5.
However, the term does not include a highway, street, or road (as defined in IC 8-23-1.1-22).
Collected 2026-10-04T20:08:46Z. Source file · JSON