K.S.A. 82a-713: Same; limiting time for perfection of appropriation; extension.
Where this section sits in the code
- Chapter 82a.—WATERS AND WATERCOURSES
- Article 7.—APPROPRIATION OF WATER FOR BENEFICIAL USE
The chief engineer shall limit the time for the perfecting of an appropriation to a reasonable period within which the proposed works can be completed by expeditious procedure, and he or she shall for good cause shown by the applicant allow an extension of time.
Collected 2026-09-04T15:15:27Z. Source file · JSON