KRS 100.307: Permits for unprofitable land.
Where this section sits in the code
- KRS Chapter 100
If the land shown on the official map is not yielding a fair return, the board of adjustment
shall have the power to grant a permit for the building which will, as little as practicable,
increase the cost of future acquisition, and the board may impose reasonable requirements
as a condition of granting such permits. Such a permit shall not be granted when the
applicant will not be substantially damaged by placing his building outside the boundary
lines of the proposed facility.