KRS 268.250: Chief engineer -- Powers and duties -- Report -- Compensation of

Read at publisher ↗
Where this section sits in the code
  1. KRS Chapter 268

engineers.

(1) When the board undertakes to establish or construct any improvement, it shall

appoint a competent civil engineer as chief engineer, who may be an individual or a

corporation, and who shall engage such assistants as the board approves. The chief

engineer shall have control of the engineering work in the district. He may, with the

consent of the board, consult any eminent engineer and obtain his opinion and

advice concerning the plans for the district. He shall make all necessary surveys of

the property within the district, and of any adjacent property that may be affected.

(2) The engineer shall make a written report to the board, with maps and profiles of the

surveys, containing a plan for draining, leveeing and reclaiming the property from

overflow or damage by water. These maps and profiles shall also indicate, so far as

necessary, the physical characteristics of the land and the location of any cities,

public roads, streets, railroads, drains and other property located on the land. The

report shall al so contain an accurate description of each tract of land within the

district, giving the name of the owner and his post office address, and a statement

showing the quantity of land. The report shall also include a property map, showing

the boundary of each tract of land, the quantity of land in each tract, the name of the

owner, and all streams, roads, railroads, and the location of all proposed

improvements. Everything filed by the engineer shall be made in triplicate by him,

one (1) marked original and th e others duplicates. The original shall not be

withdrawn from the custody of the secretary of the board, but the duplicates may be

withdrawn for use by the viewers, the board, or for use on the work by the engineer

or contractor, receipted for by the person withdrawing it and returned in due time.

(3) The compensation to engineers for making the preliminary survey and plan shall not

exceed ten dollars ($10) per day and actual expenses. The compensation of any

consulting engineer shall not exceed thirty doll ars ($30) per day, nor shall a

consulting engineer in any district be employed for more than ten (10) days. All

engineering fees in the organization of a district under employment by the board

shall not exceed five percent (5%) of the gross cost of the imp rovement made.

When any fees are sought to be allowed in excess of the above schedule and entered

into the total costs as the basis for making the levy of assessments, permission shall

first be obtained from the fiscal court.