KRS 278.271: Allowable recovery of costs not recovered in existing utility rates --
Where this section sits in the code
- KRS Chapter 278
Conditions -- Duration of cost recovery.
Notwithstanding any provision of law to the contrary, upon application by a regulated
utility, the commission may allow recovery of costs w hich are not recovered in the
existing rates of the utility for the purchase of electric power from a biomass energy
facility that has received a certificate from the Kentucky State Board on Electric
Generation and Transmission Siting pursuant to KRS 278.7 00 to 278.716. No recovery
shall be allowed unless the full costs of the purchase power agreement over the full term
of the agreement, which shall be included as part of the application, have been found by
the commission to be fair, just, and reasonable. I n determining whether the agreement is
fair, just, and reasonable, the commission may consider the policy set forth by the General
Assembly in KRS 154.27 -020(2). The commission's approval of cost recovery under this
section shall be valid for the entire initial term of the agreement.