KRS 349.020: Filing of objections to drilling -- Filing of real property interest claims --
Where this section sits in the code
- KRS Chapter 349
Issuance of drilling permit -- Department to notify Division of Mine Permits of
applications to drill -- Appeal to review board.
(1) If the drilling of a coalbed methane we ll could adversely affect the present or future
use or operation of a workable coalbed, any coal interest holder may object to a
proposed coalbed methane well, the well's location, the proposed stimulation in the
workable coalbed, or the proposed completio n in the workable coalbed. Any coal
interest holder, within twenty (20) days of receipt of the plat by him or her and by
the department, may file specific objections in writing with the department. The
filed objections shall provide sufficient detail for the applicant to identify the nature
and substance of the objection. The department shall notify the applicant of the
objections and fix a time and place for a hearing before the review board to be
conducted in accordance with KRS Chapter 13B and this chapter.
(2) If any coal interest holder, notified pursuant to KRS 349.015, or any other person,
claims to have a valid real property interest in, or the current legal right to produce,
coalbed methane, the person claiming the real property interest or right sh all notify
the applicant and the department, in writing, within twenty (20) days from the
receipt of the plat by him or her and by the department. The person also shall
request that a pooling order be entered pursuant to KRS 349.080(1).
(3) If the record o il and gas lessor, lessee, or well operator notified pursuant to KRS
349.015, or any other person, claims to have a valid real property interest in, or the
current legal right to produce, coalbed methane, the person claiming the real
property interest or r ight shall notify the applicant and the department, in writing,
within twenty (20) days from the receipt of the plat by him. The person shall request
that a pooling order be entered pursuant to KRS 349.080(1).
(4) If no objections are filed within the twen ty (20) day period, the department shall
immediately issue a drilling permit to the well operator approving the location of
the well and authorizing the well operator to proceed to drill at that location,
provided all other preconditions to issuance of a permit, as contained in this chapter,
have been met.
(5) Upon receipt of an application to drill a coalbed methane well, the department shall
provide a copy of the required plat and permit application to the division. Within
fifteen (15) days of receipt by the division, notification shall be sent to the
department by the division as to whether the proposed coalbed methane well will be
located within the boundaries of any coal mine for which a permit has been issued
or has been applied for pursuant to KRS Cha pter 350. If the proposed coalbed
methane well is to penetrate a workable coalbed that is within the area of an
existing permit for an underground mine issued by the division, or the proposed
permitted area of a pending application or permit modification f or an underground
mine before the division, the written authorization of the mine permittee shall be
required prior to issuance by the department of a permit to stimulate, complete, or
horizontally drill the coalbed methane well in the workable coalbed tha t is within
the area of an existing permit for an underground mine issued by the division or
within the proposed permitted area of a pending application or permit modification
for an underground mine before the division. If the proposed coalbed methane wel l
is to be located within a surface area permitted, or proposed in a pending
application or permit modification to be issued by the division, the written
authorization of the mine permittee shall be required prior to issuance by the
department of a permit to drill the coalbed methane well. In the absence of the
written authorization of the mine permittee, the applicant may file an appeal with
the review board requesting approval to drill the proposed coalbed methane well if:
(a) Authorization has been denied by the mine permittee; and
(b) The proposed location and area to be disturbed by the proposed coalbed
methane well has achieved either a partial bond release status or the bond for
the area has been forfeited.
Collected 2026-09-05T20:58:34Z. Source file · JSON