KRS 350.440: Placement of excess spoil.
Where this section sits in the code
- KRS Chapter 350
The permittee or operator shall place all excess spoil material resulting from surface coal
mining and reclamation operations pursuant to this chapter in the following manner:
(1) Spoil is transported and placed in a controlled manner in position for concu rrent
compaction (where advisable) and in such a way as to assure mass stability and to
prevent mass movement;
(2) The areas of disposal are within the bonded permit areas and all organic matter shall
be removed immediately prior to spoil placement;
(3) Appropriate surface and internal drainage systems and diversion ditches are used so
as to prevent spoil erosion and movement;
(4) The disposal area does not contain springs, natural watercourses, or wet -weather
seeps unless lateral drains are constructed from the wet area to the main underdrains
in such a manner that filtration of the water into the spoil pile will be prevented;
(5) If placed on a slope, the spoil is placed upon the most moderate slope among those
upon which, in the judgment of the cabinet, t he spoil could be placed in compliance
with all the requirements of this chapter and shall be placed, where possible, upon,
or above, a natural terrace, bench, or berm, if the placement provides additional
stability and prevents mass movement;
(6) Where the toe of the spoil rests on a downslope, a rock toe buttress of sufficient size
to prevent mass movement is constructed;
(7) The final configuration is compatible with the natural drainage pattern and
surroundings and suitable for intended uses;
(8) Design of the spoil disposal area is certified by a qualified registered professional
engineer in conformance with professional standards; and
(9) All other provisions of this chapter are met.