GroundRules
← Search the law
Kentucky · Snapshot 09/05/2026

KRS 350.455: Water impoundment on mining site.

Read at publisher ↗
Where this section sits in the code
  1. KRS Chapter 350

If authorized in the approved mining and reclamation plan and permit, the permittee or

operator may create permanent impoundments of water on mining sites as part of

reclamation activities only when it is adequately demonstrated that:

(1) The size of the impoundment is adequate for its intended purposes;

(2) The impoundment dam construction will be so designed as to achieve necessary

stability with an adequate margin of safety compatible with that of structures

constructed under Public Law 83-566 (16 U.S.C. 1006);

(3) The quality of impounded water will be suitable on a permanent basis for its

intended use and that discharges from the impoundment will not degrade the water

quality below water quality standards established pursuant to applicable federal and

state law in the receiving stream;

(4) The level of water will be reasonably stable;

(5) Final grading will provide adequate safety and access for proposed water users; and

(6) The water impoundments will not result in the diminution of the quality or quant ity

of water utilized by adjacent or surrounding landowners for agricultural, industrial,

recreational, or domestic uses.

Collected 2026-09-05T20:58:36Z. Source file · JSON

Browse this collection