KRS 353.741: Survey required when requested for well drilled outside an active mining
Where this section sits in the code
- KRS Chapter 353
area.
Upon the request of a coal operator, a well operator shall perform or cause to be
performed a directional survey on any well drilled outside an active mining area within
sixty (60) days of the request. The coal operator shall pay all actual costs associated with
the survey. The coal operator shall indemnify the well operator for any damages that are
incurred as a result of the performance of the directional survey, but the c oal operator
shall not be liable for any loss of revenue incurred as a result of a reasonable shut -in
period during which the directional survey is conducted.
Collected 2026-09-05T20:58:40Z. Source file · JSON