KRS 411.292: Rebuttable presumption that design, plans, and specifications prepared by
Where this section sits in the code
- KRS Chapter 411
design professional comply with applicable design and engineering standards
and contracting entity standards -- Liability.
(1) Acceptance of a project by the contractin g entity shall create a rebuttable
presumption that the:
(a) Design, plans, and specifications prepared by the design professional comply
with the applicable design and engineering standards and requirements
established or mandated by the contracting entity;
(b) Contractor followed the plans and specifications of the contracting entity; and
(c) Contractor satisfied their responsibility to the contracting entity.
(2) A contractor or design professional entitled to the rebuttable presumption
established under subsection (1) of this section shall not be liable for any claims for
property damage, physical injury, or death alleged to arise out of the work
performed on the project in any civil cause of action unless it is established by a
preponderance of the evidence that:
(a) An error or omission in the design, plans, or specifications prepared by the
design professional, resulting in a dangerous condition;
(b) A failure of the contractor to follow the plans and specifications, resulting in a
dangerous condition; or
(c) A latent defect creating a dangerous condition that is the result of the work of
the contractor;
was a substantial factor in causing the alleged property damage, physical injury, or
death.
Collected 2026-09-05T20:59:35Z. Source file · JSON