KRS 45.580: Failure to comply with KRS 45.570 constitutes breach of contract.
Where this section sits in the code
- KRS Chapter 45
Failure to comply with any of the provisions of KRS 45.570 shall constitute a material
breach of the contract.
Collected 2026-09-05T20:49:05Z. Source file · JSON