RS 48:383: Removable bridges over certain canals
Where this section sits in the code
- TITLE 48. ROADS, BRIDGES AND FERRIES
Where a highway is built across a drainage or irrigation canal which was dug by a floating dredge or which may be subject to cleaning or recleaning by a floating dredge, a bridge shall be built at the crossing of a design approved by the chief engineer which shall permit a quick, easy, and efficient removal and replacing to facilitate the cleaning of the canal.
Collected 2026-09-14T05:02:48Z. Source file · JSON