Mich. Comp. Laws § 408.1105: Prevailing wage and fringe benefit rates; posting by contractors.
Where this section sits in the code
- MI Code
- Chapter 408
- Act Act-10-of-2023
Sec. 5.
Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates prescribed in a contract and shall keep an accurate record showing the name and occupation of and the actual wages and benefits paid to each construction mechanic employed by it in connection with said contract. This record shall be available for reasonable inspection by the contracting agent or the commissioner.
Collected 2026-09-14T18:32:31Z. Source file · JSON