GroundRules
← Search the law
Mississippi · Snapshot open-us-law v2026.08, retrieved 2026-09-17

Miss. Code Ann. § 53-9-26: Miss. Code Ann. § 53-9-26

Read at publisher ↗
Where this section sits in the code
  1. MS Code
  2. Title 53

If the Permit Board finds that the probable total annual production at all locations of a surface coal mining operator will not exceed three hundred thousand (300,000) tons, the cost of conducting activities to obtain and provide the information required to be contained in the permit application as determined by the commission consistent with Section 507(c) of the federal act shall be assumed by the department, subject to the availability of federal or other special funds for that purpose and upon written request of the operator. All work under this section shall be performed by a qualified public or private laboratory or other public or private qualified entity designated by the department.

Collected 2026-09-17T20:49:39Z. Source file · JSON

Compilation CC BY 4.0, Open US Law (Vaquill AI). GroundRules uses only the releases published under CC BY 4.0: from v2026.09 the compilation is licensed CC BY-NC 4.0, and GroundRules does not use those releases. Each affected row names its release in its vintage label. GroundRules parsed and filtered the compilation to retain enacted text. Source · License

Mississippi electronic product files were republished by Public.Resource.Org under a public-domain dedication. GroundRules uses enacted text from Release 78 only as a labeled supplement to the newer Open US Law rows. Source

Browse this collection