Miss. Code Ann. § 77-5-513: Private utilities are not liable for service during six and twelve month periods.
Where this section sits in the code
- Title 77. Public Utilities and Carriers
- Chapter 5. Electric Power
- Article 11. Unfair Practices of Electricity Distributors.
During the periods of six (6) and twelve (12) months, respectively, as provided in Sections 77-5-501 and 77-5-503, no person, firm, association or corporation within the area or areas indicated upon said maps within which the filing corporation proposes to operate shall have the right to require any electric utility or electric light and power company to supply electric energy. No action shall be brought or maintained in any court for damages for failure to supply such electric energy within said periods of six (6) and twelve (12) months, respectively, or within a reasonable time thereafter. The provisions of this section shall not be deemed to apply to any valid and enforceable contracts in writing for electric service subsisting at the time of receipt by any party to such contracts of any notice of filing said maps and statements provided for in Section 77-5-501.
Collected 2026-10-27T05:54:18Z. Source file · JSON
Compilation CC BY 4.0, Open US Law (Vaquill AI). GroundRules uses only the releases published under CC BY 4.0: from v2026.09 the compilation is licensed CC BY-NC 4.0, and GroundRules does not use those releases. Each affected row names its release in its vintage label. GroundRules parsed and filtered the compilation to retain enacted text. Source · License
Mississippi electronic product files were republished by Public.Resource.Org under a public-domain dedication. GroundRules uses enacted text from Release 78 only as a labeled supplement to the newer Open US Law rows. Source