GroundRules
← Search the law
Montana · Through Montana Code Annotated 2025

69-8-603: (Effective on occurrence of contingency) Net energy measurement calculation.

Read at publisher ↗
Where this section sits in the code
  1. TITLE 69. PUBLIC UTILITIES AND CARRIERS
  2. CHAPTER 8. ELECTRIC UTILITY INDUSTRY GENERATION REINTEGRATION
  3. Part 6. Net Metering

Consistent with the other provisions of this part, and except as provided in 69-8-611(3), the net energy measurement must be calculated in the following manner:

(1) The public utility shall measure the net electricity produced or consumed during the billing period, in accordance with normal metering practices.

(2) If the electricity supplied by the public utility exceeds the electricity generated by the customer-generator and fed back to the public utility during the billing period, the customer-generator must be billed for the net electricity supplied by the public utility and billed at the appropriate rate pursuant to 69-3-306, in accordance with 69-8-602 and 69-8-610 through 69-8-612.

(3) Subject to 69-8-602 and 69-8-610 through 69-8-612, if electricity generated by the customer-generator exceeds the electricity supplied by the public utility, the customer-generator must be:

(a) billed at the appropriate rate pursuant to 69-3-306 for that billing period; and

(b) credited for the excess kilowatt hours generated during the billing period, with this kilowatt-hour credit appearing on the bill for the following billing period.

(4) On January 1, April 1, July 1, or October 1 of each year, as designated by the customer-generator as the beginning date of a 12-month billing period, any remaining unused kilowatt-hour credit accumulated during the previous 12 months must be granted to the public utility, without any compensation to the customer-generator.

Collected 2026-09-14T04:58:19Z. Source file · JSON

Browse this collection