69-8-610: Cost-benefit analysis.

Read at publisher ↗
Where this section sits in the code
  1. TITLE 69. PUBLIC UTILITIES AND CARRIERS
  2. CHAPTER 8. ELECTRIC UTILITY INDUSTRY GENERATION REINTEGRATION
  3. Part 6. Net Metering

(1) Before April 1, 2018, a public utility shall:

(a) conduct a study of the costs and benefits of customer-generators as defined in 69-8-103; and

(b) submit the study to the commission for the purpose of making determinations in accordance with a public utility's general rate case pursuant to 69-8-611.

(2) The utility may engage independent consultants or advisory services to complete a cost-benefit study. Costs are recoverable in rates.

(3) After May 3, 2017, the commission may establish minimum information required for inclusion in a study conducted by a public utility in accordance with subsection (1)(a).