GroundRules
← Search the law
North Dakota · Through 2026-07-31T11:12:02 · Newer source version available

N.D. Cent. Code § 38-08-27: Controls, inspections, and engineering design on crude oil and produced water underground gathering pipelines

Read at publisher ↗
Where this section sits in the code
  1. Title 38 Mining And Gas And Oil Production
  2. Chapter 38-08 Control Of Gas And Oil Resources

The application of this section is limited to an underground gathering pipeline that is designed or intended to transfer crude oil or produced water from a production facility for disposal, storage, or sale purposes and which was placed into service after August 1, 2015. Upon request, the operator shall provide the commission the underground gathering pipeline engineering construction design drawings and specifications, list of independent inspectors, and a plan for leak protection and monitoring for the underground gathering pipeline. Within sixty days of an underground gathering pipeline being placed into service, the operator of that pipeline shall file with the commission an independent inspector's certificate of hydrostatic or pneumatic testing of the underground gathering pipeline.

Collected 2026-09-02T21:04:14Z. Source file · JSON

Browse this collection