N.D. Cent. Code § 38-25-03: Permit required - Permit transfer
Where this section sits in the code
- Title 38 Mining And Gas And Oil Production
- Chapter 38-25 Underground Storage Of Oil And Gas
Geologic storage is allowed if permitted by the commission. A permit may be transferred if the commission consents.
Collected 2026-09-02T21:04:14Z. Source file · JSON