GroundRules
← Search the law
North Dakota · Through 2026-07-31T11:12:02 · Newer source version available

N.D. Cent. Code § 61-24.3-06: Secondary transmission mains

Read at publisher ↗
Where this section sits in the code
  1. Title 61 Waters
  2. Chapter 61-24.3 Southwest Pipeline Project

Secondary transmission mains shall be constructed as part of the southwest pipeline project, as provided in the engineering preliminary design final report for the southwest pipeline project, state water commission project no. 1736, dated September 1982, except as provided in section 61-24.3-03.

Collected 2026-09-02T21:04:14Z. Source file · JSON

Browse this collection