GroundRules
← Search the law
North Dakota · Through 2026-07-31T11:12:02 · Newer source version available

N.D. Cent. Code § 61-41-03: Mouse River enhanced flood control project

Read at publisher ↗
Where this section sits in the code
  1. Title 61 Waters
  2. Chapter 61-41 Water Policy And Projects

1.The legislative assembly declares its intent to provide state funding for a share of the nonfederal or local cost of constructing the Mouse River enhanced flood control project.

2.Any funds appropriated for the construction of the Mouse River enhanced flood control project may be carried over to future bienniums.

3.State funding for the Mouse River enhanced flood control project may be appropriated at the time and in the manner determined by the legislative assembly, either concurrently or separately from federal and local funding for the Mouse River enhanced flood control project.

Collected 2026-09-02T21:04:14Z. Source file · JSON

Browse this collection