GroundRules
← Search the law
Nebraska · Snapshot open-us-law v2026.08, retrieved 2026-09-14

Neb. Rev. Stat. § 37-1712: Neb. Rev. Stat. § 37-1712

Read at publisher ↗
Where this section sits in the code
  1. NE Code
  2. Chapter 37

Project performance criteria means the performance requirements of the project suitable to allow the design-builder to make a proposal. Performance requirements shall include, but are not limited to, the following, if required by the project: Capacity, durability, standards, ingress and egress requirements, description of the site, surveys, soil and environmental information concerning the site, material quality standards, design and milestone dates, site development requirements, compliance with applicable law, and other criteria for the intended use of the project.

Collected 2026-09-14T18:32:21Z. Source file · JSON

Browse this collection