GroundRules
← Search the law
Nevada · Through 2025 session (NRS as revised 2026-08-25) · Newer source version available

NRS 268.714: “Sewerage project” defined.

Read at publisher ↗
Where this section sits in the code
  1. TITLE 21 — CITIES AND TOWNS
  2. CHAPTER 268 - POWERS AND DUTIES COMMON TO CITIES AND TOWNS INCORPORATED UNDER GENERAL OR SPECIAL LAWS
  3. CITY BOND LAW

“Sewerage project” means facilities pertaining to a municipal sanitary sewerage system for the collection, interception, transportation, treatment, purification and disposal of sewage, liquid wastes, solid wastes, night soil and industrial wastes, including without limitation a sewerage treatment plant, sewerage purification and treatment works and disposal facilities, drying beds, pumping plant and station, connections, laterals, other collection lines, outfalls, outfall sewers, trunk sewers, intercepting sewers, force mains, water lines, sewer lines, conduits, ditches, pipes, and transmission lines, pumping plants, filter plants, power plants, pumping stations, gauging stations, ventilating facilities, incinerators, engines, valves, pumps, meters, apparatus, fixtures, structures, buildings and other facilities for the collection, interception, transportation, treatment, purification and disposal of sewage, liquid wastes, solid wastes, night soil and industrial wastes (or any combination thereof). A sewerage project may include as a part thereof a “drainage project” as herein defined.

Collected 2026-09-03T05:51:35Z. Source file · JSON

Browse this collection