GroundRules
← Search the law
Nevada · Through 2025 session (NRS as revised 2026-08-25) · Newer source version available

NRS 445A.580: Continuing planning process.

Read at publisher ↗
Where this section sits in the code
  1. TITLE 40 — PUBLIC HEALTH AND SAFETY
  2. CHAPTER 445A - WATER CONTROLS
  3. WATER POLLUTION CONTROL

The Department shall establish a continuing planning process consistent with all applicable federal requirements which results in plans for all waters of the State and includes:

1. Adequate effluent limitations and schedules of compliance;

2. The incorporation of all elements of any applicable areawide plans for management of waste and plans for basins under NRS 445A.300 to 445A.730, inclusive;

3. Total maximum daily load for pollutants and contaminants;

4. Procedures for revision of the plans;

5. Adequate authority for intergovernmental cooperation;

6. Adequate implementation, including schedules of compliance, for revised or new standards of water quality;

7. Controls over the disposition of all residual waste from any treatment of water;

8. An inventory and ranking, in order of priority, of needs for construction of treatment works; and

9. Controls over the injection of fluids through a well to prevent the degradation of underground water.

Collected 2026-09-03T05:51:40Z. Source file · JSON

Browse this collection