GroundRules
← Search the law
Nevada · Through 2025 session (NRS as revised 2026-08-25) · Newer source version available

NRS 704.706: Conversion of facility to allow firing by coal: Application for adjustment of rates; public hearing.

Read at publisher ↗
Where this section sits in the code
  1. TITLE 58 — ENERGY; PUBLIC UTILITIES AND SIMILAR ENTITIES
  2. CHAPTER 704 - REGULATION OF PUBLIC UTILITIES GENERALLY
  3. ELECTRIC SERVICE
  4. Conversion of Certain Generation Facilities

1. A public utility proposing to convert an existing facility in this state for the generation of electricity which is fired by gas or oil to a facility which is also capable of being fired by coal may apply to the Commission for an adjustment in its rates to permit its recovery of the cost of the conversion.

2. After receipt of such an application, the Commission shall hold a public hearing within 120 days to consider whether to authorize such an adjustment and, if authorized, the methods to be used to permit the recovery.

Collected 2026-09-03T05:51:47Z. Source file · JSON

Browse this collection